Building a new home in Palo Alto Hills
Parcel data, the zoning rules for every residential zone in Palo Alto Hills, the five most common new-home designs from five years of permits, with front elevations from public plan sets, and the permit path for a teardown and rebuild.
Browse all 24 Palo Alto neighborhoods
- Barron Park33 new
- Charleston Meadows8 new
- Charleston Terrace10 new
- College Terrace8 new
- Community Center10 new
- Crescent Park21 new
- Downtown North2 new
- Duveneck/St Francis13 new
- Evergreen Park2 new
- Fairmeadow3 new
- Green Acres6 new
- Greenmeadow3 new
- Leland Manor/Garland8 new
- Midtown/Midtown West57 new
- Oak Creek0 new
- Old Palo Alto25 new
- Palo Alto Hills0 new
- Palo Verde36 new
- Professorville1 new
- Research Park1 new
- Southgate4 new
- University Park0 new
- University South3 new
- Ventura5 new
Lots in Palo Alto Hills
88 parcels in the city's Palo Alto Hills boundary[1], 74 of them in residential zones[2]. Typical residential lot: 35,785 to 43,886 sf (middle half), median width about 189 ft (GIS estimate), median year built 1971.
Lot sizes
Zones
Overlays and flags
Your lot
Zoning rules for a new home in Palo Alto Hills
Development standards for the residential zones that cover most of Palo Alto Hills. R-1 values come from the official online code; values marked verify with the city were read from a third-party code mirror and have not been confirmed against the official Title 18 text.
| Rule | RE |
|---|---|
| Minimum lot (new lots) | 43,560 sf, 100 ft wide, 100 ft deep verify with the city |
| Max floor area (FAR) | 0.45 x first 5,000 sf + 0.30 x remainder; max house size 6,000 sf verify with the city |
| Setbacks | Front: 30 ft Rear: 30 ft Interior side: 15 ft Street side: 24 ft verify with the city |
| Height | 30 ft verify with the city |
| Daylight plane | Side: 10 ft, 45 deg Front: 16 ft, 60 deg Rear: 16 ft, 60 deg verify with the city |
| Site coverage | One-story: 25% Two-story: 25% of lot +5% for patios/overhangs verify with the city |
| Units allowed | 1 unit; 2 units need 1 acre verify with the city |
| Two-story review | not compiled for this zone |
| ADU / JADU | Detached ADU up to 800 sf with 4 ft side/rear setbacks and 16 ft height is guaranteed[4]; city ADUs up to 900 sf (1,000 sf with 2+ bedrooms), with up to 800 sf excluded from FAR[5]; JADU up to 500 sf inside the home[6] |
| SB 9 | Two units ministerially, 4 ft side/rear setbacks; urban lot split into lots of at least 1,200 sf and 40% of the original; excluded in flood hazard areas and historic districts/inventory[7,8,9]verify with the city |
| Code source | [10] |
Top 5 new-home designs in Palo Alto Hills
No new-home (teardown-rebuild) building permits were found in Palo Alto Hills for Nov 19, 2021 to Nov 16, 2026.[11]
The permit path for a new home here
- Check the lot: zone, overlays, flood and historic flags (lookup above).
- Survey, certified-arborist tree disclosure (T-1), and a historic check if the house is over 45 years old.[12,13,14]
- Two-story home: meet the objective two-story standards or apply for Individual Review (IR fee $16,575).[15,16]
- Deconstruction permit (demolition is not allowed), with an Air District J number and salvage survey.[17,18]
- Building permit plan check, Public Works grading and drainage, utilities, fees.[19,20,21]
- Inspections, final and occupancy.[12]
No residential lots here are in a mapped FEMA flood hazard area in the city layer.
Sources and last-checked dates
- City of Palo Alto ArcGIS: Neighbourhood boundaries layer
- City of Palo Alto ArcGIS: AssessorsParcels layer (zone, lot size, city-computed FAR, coverage, setbacks, height, flood and historic flags)
- City of Palo Alto ArcGIS: 100-Year Flood Map layer (FEMA zones)
- Palo Alto Municipal Code 18.09.030 (state-exempt ADUs/JADUs, Table 1)
- PAMC 18.09.040 City-standard ADUs (Table 2, 800 sf FAR exclusion), via GoCodebook mirror third-party mirror: verify with the city
- PAMC 18.09.050 JADUs and JADU floor-area bonus, via GoCodebook mirror third-party mirror: verify with the city
- PAMC 18.42.180 SB 9 two-unit projects, via GoCodebook mirror third-party mirror: verify with the city
- PAMC 21.10.040 SB 9 urban lot split (1,200 sf, 40% rule), via GoCodebook mirror third-party mirror: verify with the city
- PAMC 21.10.030 SB 9 lot split exclusions, via GoCodebook mirror third-party mirror: verify with the city
- PAMC 18.10.040 RE, R-2 and RMD development standards (Table 2), via GoCodebook mirror third-party mirror: verify with the city
- City of Palo Alto Open Data: Palo Alto Development Center Permits (Building module export, Dec 2017 to Nov 16, 2026)
- City of Palo Alto: New Single-Family Residence submittal checklist (2026, PDF)
- City of Palo Alto Urban Forestry: Tree Ordinance Information (protected trees, T-1 tree disclosure)
- City of Palo Alto: Historic Resources & Permit Review Requirements bulletin (PDF)
- City of Palo Alto Planning: Forms & Applications (single-family homes, Individual Review, objective standards)
- City of Palo Alto: Planning Division application fee schedule effective Aug 17, 2026 (FY27, PDF)
- City of Palo Alto Zero Waste: Deconstruction Ordinance
- City of Palo Alto: Deconstruction/Demolition submittal checklist (7-2026, PDF)
- City of Palo Alto: Apply for a Building Permit
- City of Palo Alto Public Works: Residential construction requirements handout (PDF)
- City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule (PDF; Development Services - Building, pp. 63-69)