Home building services in San Francisco and San Mateo County
What each type of project involves, which rules usually apply, and where to read the official rules. Each city guide has the local details.
Custom homes
Building a new single-family home usually means a survey and soils report, design review by the city’s planning department (for example, Burlingame’s Chapter 25.68 Design Review, San Mateo’s Single-Family Dwelling Design Review, or Hillsborough’s Architecture and Design Review Board), and then building plan check. New homes must meet the California Energy Code, and some cities, such as San Francisco, require all-electric new buildings. See SF.gov: All-Electric Buildings (last checked 2026-11-18).
Teardown and rebuild
Replacing an old house usually takes a city demolition permit, an Air District demolition notification (J number) at least 10 working days ahead (72 hours for buildings of four or fewer units with an extra fee), asbestos sampling of specific materials, utility disconnects (PG&E gas and electric, water, sewer lateral), tree protection or removal permits, and design approval for the replacement home. In San Francisco, removing a home generally needs Conditional Use Authorization under Planning Code §317, and buildings 45 years or older get historic review. Sources: Air District asbestos FAQ, PG&E Building and Renovation Services, SF Planning Code §317 (all last checked 2026-11-18).
ADUs and JADUs
California requires cities to decide complete ADU applications within 60 days when there is an existing home. JADUs are limited to 500 sq ft inside the home, and ADUs of 750 sq ft or less pay no impact fees. Many cities in this guide, including Atherton, Belmont, Brisbane, Burlingame and Colma, offer pre-approved ADU plans with faster review. Source: HCD ADU Handbook (March 2026) (last checked 2026-11-18).
SB 9 lot splits and two-unit projects
SB 9 allows up to two homes on a single-family lot, or a split into two lots, with ministerial (no-hearing) approval when state and local objective standards are met. Each new lot is generally at least 1,200 sq ft and neither is smaller than 40% of the original. Lot-split applicants sign a three-year owner-occupancy affidavit, and recently tenant-occupied housing cannot be demolished. Source: HCD SB 9 Fact Sheet (last checked 2026-11-18).
Remodels
Kitchens, baths and interior remodels that touch structure, electrical, plumbing, gas or mechanical systems need permits. Painting, flooring, cabinets and countertops are generally exempt under California Residential Code §R105.2 as cities adopt it. Source: 2025 California Residential Code, Chapter 1 (last checked 2026-11-18). Homes built before 1978 fall under EPA’s lead-safe RRP rule.
Additions and second stories
Additions go through plan check and often trigger design review. For example, Belmont says additions of 400 sq ft or more generally go to the Planning Commission, and San Mateo requires design review for new second stories. School districts may charge fees on additions over 500 sq ft (Education Code §17620). Details and sources are in each city guide.
Seismic retrofit
Earthquake Brace + Bolt offers grants of up to $3,000 for houses built before 1980 on raised foundations in eligible ZIP codes, and Earthquake Soft-Story offers up to $13,000 for homes with living space over a garage (CRMP, last checked 2026-11-18). San Francisco requires soft-story retrofits for wood-frame buildings with five or more units and three or more stories permitted before 1978 (SF Earthquake Safety Implementation Program).
Cities covered
See the full list of city guides, including San Francisco and all 20 incorporated cities in San Mateo County.