Building a new home in Oak Creek
Parcel data, the zoning rules for every residential zone in Oak Creek, the five most common new-home designs from five years of permits, with front elevations from public plan sets, and the permit path for a teardown and rebuild.
Browse all 24 Palo Alto neighborhoods
- Barron Park33 new
- Charleston Meadows8 new
- Charleston Terrace10 new
- College Terrace8 new
- Community Center10 new
- Crescent Park21 new
- Downtown North2 new
- Duveneck/St Francis13 new
- Evergreen Park2 new
- Fairmeadow3 new
- Green Acres6 new
- Greenmeadow3 new
- Leland Manor/Garland8 new
- Midtown/Midtown West57 new
- Oak Creek0 new
- Old Palo Alto25 new
- Palo Alto Hills0 new
- Palo Verde36 new
- Professorville1 new
- Research Park1 new
- Southgate4 new
- University Park0 new
- University South3 new
- Ventura5 new
Lots in Oak Creek
7 parcels in the city's Oak Creek boundary[1], 5 of them in residential zones[2]. Typical residential lot: 616,809 to 804,553 sf (middle half), median width about 721 ft (GIS estimate), median year built 2001.0.
Lot sizes
Zones
Overlays and flags
Your lot
Zoning rules for a new home in Oak Creek
Development standards for the residential zones that cover most of Oak Creek. R-1 values come from the official online code; values marked verify with the city were read from a third-party code mirror and have not been confirmed against the official Title 18 text.
| Rule | RM-30 (D) |
|---|---|
| Minimum lot (new lots) | 8,500 sf, 70 ft wide, 100 ft deep verify with the city |
| Max floor area (FAR) | 0.6 x lot area verify with the city |
| Setbacks | Front: 20 ft Rear: 10 ft Interior side: 10 (lots >=70 ft wide) / 6 (narrower) ft Street side: 16 ft verify with the city |
| Height | 35 ft verify with the city |
| Daylight plane | Side/rear: 10 ft, 45 deg where abutting R-1/R-2/RMD/RM-20 verify with the city |
| Site coverage | 40% of lot +5% for patios/overhangs verify with the city |
| Units allowed | max 30 du/acre, min 16 du/acre; any lot >=5,000 sf may have 2 units verify with the city |
| Two-story review | not compiled for this zone |
| ADU / JADU | not compiled for multifamily zones |
| SB 9 | Does not apply (not R-1/RE) |
| Code source | [3] |
Top 5 new-home designs in Oak Creek
No new-home (teardown-rebuild) building permits were found in Oak Creek for Nov 19, 2021 to Nov 16, 2026.[4]
The permit path for a new home here
- Check the lot: zone, overlays, flood and historic flags (lookup above).
- Survey, certified-arborist tree disclosure (T-1), and a historic check if the house is over 45 years old.[5,6,7]
- Two-story home: meet the objective two-story standards or apply for Individual Review (IR fee $16,575).[8,9]
- Deconstruction permit (demolition is not allowed), with an Air District J number and salvage survey.[10,11]
- Building permit plan check, Public Works grading and drainage, utilities, fees.[12,13,14]
- Inspections, final and occupancy.[5]
Flood hazard areas cover 20% of residential lots here: those lots need the Public Works flood checklist with the building permit.[5]
Sources and last-checked dates
- City of Palo Alto ArcGIS: Neighbourhood boundaries layer
- City of Palo Alto ArcGIS: AssessorsParcels layer (zone, lot size, city-computed FAR, coverage, setbacks, height, flood and historic flags)
- PAMC 18.13.040 RM-20/30/40 development standards (Table 2), via GoCodebook mirror third-party mirror: verify with the city
- City of Palo Alto Open Data: Palo Alto Development Center Permits (Building module export, Dec 2017 to Nov 16, 2026)
- City of Palo Alto: New Single-Family Residence submittal checklist (2026, PDF)
- City of Palo Alto Urban Forestry: Tree Ordinance Information (protected trees, T-1 tree disclosure)
- City of Palo Alto: Historic Resources & Permit Review Requirements bulletin (PDF)
- City of Palo Alto Planning: Forms & Applications (single-family homes, Individual Review, objective standards)
- City of Palo Alto: Planning Division application fee schedule effective Aug 17, 2026 (FY27, PDF)
- City of Palo Alto Zero Waste: Deconstruction Ordinance
- City of Palo Alto: Deconstruction/Demolition submittal checklist (7-2026, PDF)
- City of Palo Alto: Apply for a Building Permit
- City of Palo Alto Public Works: Residential construction requirements handout (PDF)
- City of Palo Alto: FY 2027 Adopted Municipal Fee Schedule (PDF; Development Services - Building, pp. 63-69)