Building and planning contacts
- Planning Department: (650) 851-6796 (per the ADU Resource Center). [1]
ADU contact listed by the county ADU Resource Center: Contact Planning Department: (650) 851-6796
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 3, 2026 [1]. Confirm details with the city before you design.
| Size | Min: Minimum allowed by Building Code. Max attached ADU: 50% of the main residence size, including the ADU, or 1,500 sf, whichever is less. Max detached ADU: 1,500 sf, including any attached garage. Within basic setbacks: No more than 800 sf of an ADU’s floor area. ADU within a barn: Up to 50% of the barn footprint, but never limited below 850 sf, or 1,000 sf with more than one bedroom. Barn or stable conversion: One existing barn or stable per lot may exceed 1,500 sf if the §153.211(B)(1) standards are met. Basement ADU: Same size limits as attached and detached ADUs. Max JADU: 500 sf |
|---|---|
| Height | Attached, meeting basic setbacks: Up to the height allowed for a two-story main residence (28 ft in R-1; 30 ft in SR, RR, SCP). Attached, within basic setbacks: 17 ft, with 11 ft plate height. Detached: 17 ft, with 11 ft plate height. Above a detached garage, meeting basic setbacks: 18 ft, with 12 ft plate height. Greater heights: see Exceptions. |
| Setbacks | Basic setbacks (Table H; front / rear / side, under 17 ft tall): R-1: 30 ft / 25 ft / 15 ft. SR: 50 / 25 / 20 ft. RR and SCP: 50 ft / 50 ft / 50 ft. Taller structures, Woodside Glens lots, and Woodside Hills differ; check Table H. New detached ADU: 4 ft side and rear; front per Table H. New attached ADU: 4 ft side and rear, but no part of the main residence may be in the required setbacks. Limit in basic setbacks: Any size ADU may use the 4 ft setback, but only 800 sf of its floor area may be within basic setbacks. Multiple ADUs: Only one unit may use the 4 ft setback. Other new units must meet basic setbacks, unless created by converting space in an existing structure. Conversions: No new setback for an existing garage or accessory structure. Above an existing garage: 4 ft or the garage’s existing setback, whichever is greater. Front setback: May be reduced only through the Exceptions row process for one 800 sf ADU. |
| Parking | JADUs: No parking required. ADUs: One space per ADU with one or more bedrooms; none for studios. Tandem parking and parking in setback areas are allowed unless specific findings show they are not feasible. No parking required if the ADU: Is within ½ mile walking distance of public transit, including stations and bus stops; is in an architecturally and historically significant historic district; is part of the existing main residence or an existing accessory structure; is in an area where parking permits are required but not offered to the occupant; is within one block of a car-share vehicle; or is proposed with a new dwelling on the same lot and meets one of these criteria. |
| Owner occupancy | JADUs: Required; the owner may live in the main residence or the JADU. Not required if the owner is a governmental agency, land trust, or housing organization. ADUs: Not required. |
| Process & timeline | Review: ADUs and JADUs are ministerial, with no discretionary review or hearing. The Planning Director approves or denies within 60 days of a complete application. For an ADU proposed with a new main dwelling, the Director need not act before the main dwelling permit is issued. Denial: Requires a finding that the ADU would be detrimental to public health and safety, with written reasons within 60 days. The Town cannot deny an ADU over nonconforming conditions, code violations, or unpermitted structures that pose no health or safety threat and would not be affected by the ADU. Approval cannot be conditioned on correcting nonconforming zoning conditions. Notice: Projects using a setback exception or the 800 sf exception require notice to adjacent owners, including across an abutting road, within 5 business days of a complete application. The notice states there are no appeal rights. Permit routing: Stand alone proposed JADUs, and/or ADUs are reviewed by all Town departments with submitted construction permit applications (building/site development). General construction applications require review by the Town of Woodside, Woodside Fire Protection District, and San Mateo County Environmental Health. Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). |
| Exceptions | 800 sf ADU: If one 800 sf ADU cannot meet all zoning rules, the applicant submits the information the Town requests, such as a survey or septic study, showing infeasibility. The Planning Director then decides which rules to reduce or waive, choosing locations with the fewest impacts on sensitive areas. Height, detached: One ADU of 800 sf or less, 16 ft or lower, has no plate height limit if it complies with Gov. Code §66323. 18 ft with a multistory multifamily primary structure. 18 ft, or 20 ft to match the main residence roof pitch, within ½ mile walking distance of a major transit stop or high-quality transit corridor. Downward-sloped lots: Up to 28 ft on the downslope side, with limits on the upslope side, if average slope is 15% or more, basic setbacks are met, and the footprint is 1,500 sf or less. Shed roofs: Plate height up to 14 ft on the taller side and 11 ft on the shorter side, if basic setbacks are met. Above a detached garage: Up to 24 ft with 18 ft plate height if the lot meets the minimum subdivision size and added setbacks are provided: 2 ft for each foot over 12 ft plate or 18 ft height, from R-1: 30/25/22.5 ft; SR: 50/30/30 ft; RR and SCP: 50/50/50 ft (front/rear/side). Dormers: Above a detached garage meeting basic setbacks, up to 65% of each roof side. Slopes: An ADU, its septic system, or utilities may be on 35%–50% slopes if infeasible on slopes of 35% or less. The ADU may not include an attached garage, new main residence area, or other non-ADU use. |
| Other local requirements | Portions over 800 sf: Any portion of an ADU over 800 sf must meet all development standards for the zoning district and may not encroach into basic setbacks. Fire and building: ADU shall comply with Fire District and Building Department regulations. Contact Woodside Fire Protection District and Woodside Building Department. Sprinklers are not required unless required for the main residence, and an ADU does not trigger them in an existing residence. Barn ADUs and the barn require sprinklers and firewall separation. Septic: Limitations to septic installation may apply. Contact Town of Woodside and San Mateo County Department of Environmental Health. An ADU may use a dedicated system or one shared with the main residence or other ADUs. Utilities: ADU shall have all utility connects prescribed by CBC/CRC. Driveway: Use the principal access driveway unless a second driveway exception is approved under §151.44. Rentals: No terms under 30 consecutive days. Barn conversions: Location, footprint, heights, and eaves may not change; exterior materials are restricted; the unit may later convert only to a barn or stable; a covenant must be recorded. Historic structures: Conversion of existing historical structures into ADUs is encouraged by the Town if the project complies with all applicable Zoning and Building Codes, and the California Secretary of Interior Standards for Historical Resources. |
| Zones allowed | Attached ADUs: R-1, SR, RR, SCP-5/7.5/10; in CC, within a building only. Detached ADUs: R-1, SR, RR, SCP-5/7.5/10. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [2][3]
SB 9: two units or a lot split
- Woodside’s Urban Lot Split (SB 9) review submittal requirements were updated July 9, 2026. [4]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [5]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- The demolition checklist asks for plans identifying structures to be removed, every existing tree’s species, diameter, location and drip line, and a tree protection plan. [6]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [7][8]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [7]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [9]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [10][11]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New homes go through ASRB conceptual and then formal design review (some to the Planning Commission), with a survey of significant trees. [12][13]
- Planning has separate submittal requirements for building permits and Site Development Permits. [14]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- See Planning’s submittal requirements for building permits. [14]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: ADU – 1,493 sf, detached: $20,700
*No Town building permit/inspection fees are required [1] - Per the ADU Resource Center, no Town building permit or inspection fees are charged for ADUs. [1]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [2]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- Woodside is not listed on WestLight Energy’s reach code page, so state energy code minimums likely apply. Confirm with the building division. [19]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [11][20]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [21]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [21]
Not published or not verified
- Woodside is not on WestLight Energy’s reach-code list; its electrification rules were not checked.
- Fee schedule for new homes not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Woodside local ADU rules (source page updated November 3, 2026)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- Town of Woodside: Urban Lot Split (SB 9) Review Submittal Requirements (07-09-26, PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- Town of Woodside: Demolition Permit Submittal Checklist (PDF)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Town of Woodside: ASRB Conceptual Design Review submittal requirements (PDF)
- Town of Woodside: ASRB/PC Formal Design Review submittal requirements (PDF)
- Town of Woodside: Planning submittal requirements for Building Permits and Site Development Permits (PDF)
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance