Building, remodeling or rebuilding a home in South San Francisco, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning Division: (650) 877-8535, planning@ssfca.gov (per the ADU Resource Center). [1]
- Building Division. [2]
ADU contact listed by the county ADU Resource Center: Planning Division, planning@ssfca.gov, (650) 877-8535
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 30, 2026 [1]. Confirm details with the city before you design.
| Size | Minimums: no ADU minimum in § 20.350.003; a JADU must be at least an efficiency unit (Health & Safety Code § 17958.1). Maximums (interior livable space): Detached state-mandated ADU on a single-unit lot: 800 sf Local-standards ADU: 1,000 sf (800 sf if FAR or lot coverage limits are not met) Converted ADU, within the existing structure, plus up to 150 sf for ingress/egress JADU: 500 sf State-mandated detached ADUs on multifamily lots, no size cap listed. |
|---|---|
| Height | Detached: 18 feet; up to 20 feet to match the primary dwelling’s roof pitch if within ½ mile walking distance of a major transit stop or high-quality transit corridor. Attached: height allowed in the underlying zoning district. |
| Setbacks | Street side, interior side, rear: 4 feet (attached and detached). Front: underlying zoning for local-standards ADUs; waived for state-mandated ADUs. Distance between structures: 4 feet, including eaves, between an ADU behind the primary dwelling and other structures. |
| Parking | JADUs: No parking required ADUs: 1 space per ADU or per bedroom, whichever is less; tandem or in setbacks allowed unless the Chief Planner finds it infeasible. No parking required if: Within ½ mile walking distance from public transit; In an architecturally and historically significant district; Converted within existing or proposed primary residence or accessory structure; Submitted with an application to create a new primary single- or multiple-unit dwelling; One block from a car-share vehicle; or On-street parking permits are required but not offered to ADU occupant. Garage conversion or demolition: no replacement parking required. |
| Owner occupancy | ADUs: not required. JADUs: required only if the JADU shares sanitation facilities with the primary dwelling; not required with separate sanitation. Short-term rentals: ADUs and JADUs may not be rented for less than 31 consecutive days. |
| Process & timeline | Ministerial approval with no discretionary review or hearing, within 60 days of a complete application. Submit a Building Permit application (City permitting portal) and a Deed Restriction application. An ADU submitted with a new primary dwelling is not acted on until the primary dwelling is approved. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | Appeal process or Waiver and Modifications are at the discretion of the Chief Planner. Per § 20.350.003(G), setbacks (including front), height, density, lot coverage, FAR and building-separation standards are waived for state-mandated ADUs: converted ADUs on single-unit lots; detached ADUs up to 800 sf on single-unit lots that meet the height limit and 4-foot side and rear setbacks; converted ADUs on existing multifamily lots; and detached ADUs on existing multifamily lots up to 18 feet tall with 4-foot side and rear setbacks. Building, electrical, fire, utility and structural safety codes still apply. |
| Other local requirements | Deed restriction recorded before the Building Permit (ADUs and JADUs). Design: local-standards ADUs follow Chapter 20.310 (§ 20.310.003 for detached ADUs and attached ADUs on single-unit lots; § 20.310.004 for attached ADUs on multifamily lots); state-mandated ADUs are exempt. Separate exterior entry required; a JADU without its own bathroom also needs interior access to the primary dwelling; JADUs need an efficiency kitchen. Separate electric and water meters required; adequate water and sewer service required. ADUs may not be sold separately unless allowed under Gov. Code § 66341. Fire sprinklers not required unless required for the primary dwelling. Unpermitted ADUs built before January 1, 2020 may apply for legalization or a 5-year delay in enforcement (applications accepted until January 1, 2030). Tree removals may require a permit. Local-standards ADUs must meet the zoning district’s development standards; state-mandated ADUs need only meet building, fire and safety codes. |
| Zones allowed | Any district where single-unit and/or multiple-unit dwellings are permitted or conditionally permitted, with an existing dwelling or one proposed along with the ADU. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- Submit SB 9 lot splits and/or two-unit plans through the Building Division permitting portal; review is ministerial with no public hearing. New lots must be at least 1,200 sq ft and at least 40% of the original lot. [5]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [6]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition requires a Building Division permit. [7]
- Removing a protected tree needs a separate permit per tree; the City lists a $121 fee and a $368 planting deposit. [8][9]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [10][11]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [10]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [12]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [13][14]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New-home design review triggers were not checked; ask Planning. [2]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Plan Submittal & Permit Requirements lists what each project type needs. [7]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: ADU 1(429 sf, attached): $6,000
ADU 2 (640 sf, above garage): $7,000 [1] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists South San Francisco among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [19][20]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [14][21]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [22]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [22]
Not published or not verified
- Fee schedule beyond tree permits was not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): South San Francisco local ADU rules (source page updated October 30, 2026)
- City of South San Francisco: Building Division
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of South San Francisco: SB 9 General Information handout (2024, PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- City of South San Francisco: Plan Submittal & Permit Requirements
- City of South San Francisco: Trees
- South San Francisco Municipal Code Chapter 13.30: Tree Preservation
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance