Building, remodeling or rebuilding a home in San Mateo, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning: (650) 522-7212, planning@cityofsanmateo.org (per the ADU Resource Center). [1]
ADU contact listed by the county ADU Resource Center: 650.522.7212 – planning@cityofsanmateo.org
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 29, 2026 [1]. Confirm details with the city before you design.
| Size | Min: None. Max ADU: No fixed maximum; ADUs over 800 sq ft are limited by the underlying zoning FAR (at least 800 sq ft allowed). An ADU may not be larger than the primary home (on multifamily lots, the smallest unit); if the primary is 800 sq ft or less, an 800 sq ft ADU is still allowed. Conversion ADU: No size limit; may expand up to 150 sq ft for ingress/egress. Max JADU: 500 square feet, including attic and basement areas. |
|---|---|
| Height | Detached ADUs: 18 feet to top plate; 24 feet to roof peak. Attached ADUs: 24 feet to top plate; 32 feet to roof peak. Measured from existing grade. Two-story units are allowed provided they meet these standards. |
| Setbacks | Side and rear: 4 feet for new construction, including ADUs above an existing garage. Front: Set by underlying zoning; none for a state-exempt ADU. No setback: Conversions built in the same location and to the same dimensions as an existing garage or accessory structure, or a detached ADU in the rear one-third of the lot meeting the accessory-structure yard rules (Ch. 27.70). Separation (multifamily lots): Detached ADUs at least 4 feet from the primary structure, open to the sky. Daylight plane (nonexempt ADUs): Meet R1 daylight plane from the nearest side and rear property lines. |
| Parking | JADUs and ADUs: No parking required. Garage, carport, or parking spaces converted or demolished for an ADU/JADU need not be replaced. Voluntary parking allowed on the same lot (up to 2 stalls per unit; garage, carport, uncovered, or tandem). |
| Owner occupancy | JADUs: Required only if the JADU shares sanitation facilities with the main home; owner may live in either unit. Not required if the JADU has its own sanitation, or the owner is a government agency, land trust, or housing organization. ADUs: Not required. |
| Process & timeline | Only a ministerial building permit required, review includes Planning, Public Works, Building, Fire, and Arborist (if the construction involves removal of trees). |
| Exceptions | Applicants may request discretionary review by the Zoning Administrator for ADUs that do not meet objective standards (e.g., height, setback, daylight plane, second-story decks). It cannot be used to exceed the lot’s maximum floor area. Approval requires all of these findings: the ADU is consistent with the objective design standards in the adopted R1 Single-Family Dwelling Design Guidelines; it would not negatively affect public health, safety, or welfare; for height, setback, or daylight plane deviations, exceptional circumstances make compliance an undue hardship and deviations are minimized; for second-story decks over 50 sq ft, the deck is located, oriented, and screened to minimize views into neighbors’ windows and yards; and the ADU is consistent with the General Plan. Decisions may be appealed to the City Manager or designee. |
| Other local requirements | Sale & rental: JADUs may not be sold separately; ADUs may not be sold separately except as allowed by Gov. Code §66341. Units may be rented, but short-term rentals (under 30 days) are prohibited. JADUs require a recorded deed restriction. Fire safety: New ADUs (attached and detached) require sprinklers if the main dwelling has sprinklers or if over 1,200 sq ft (total area). Attached ADUs also require sprinklers if 50% or more of the main dwelling is being rebuilt or added. JADUs: no sprinklers unless a “substantial remodel”; linked smoke alarm and carbon monoxide detector required. Contact the Fire Department at 650.522.7940 for additional questions. Architectural standards (nonexempt ADUs): Second-story windows within 5 ft of a residential lot line glazed (obscured) up to 5 ft from finish floor; 5-ft setback for exterior staircases, with landing limited to the minimum required; no rooftop decks; second-story decks no larger than 50 sq ft, outside underlying zoning setbacks, and not facing adjacent residential properties. Access: ADUs need a separate exterior entrance (interior access optional). JADUs need a separate exterior entrance and must be within the home (including an attached garage); interior access required if sanitation or utility controls are shared; efficiency kitchen required. Utility connections: Not required for conversion ADUs or JADUs; the City may require separate connections for other ADUs. ADUs are not considered new residential units for calculating City connection fees or capacity charges, unless built with a new primary home. Each ADU/JADU needs a separate address. |
| Zones allowed | ADUs: Lots in all zoning districts that allow residential uses. JADUs: Lots zoned for single-family use or with an existing or proposed single-family home; not allowed on condominium, townhouse, or multifamily lots. |
| Minimum lot size | 0 |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [2][3]
SB 9: two units or a lot split
- San Mateo adopted Ordinance 2022-10 to implement SB 9; lot split standards are in §27.21.140, and the City publishes a submittal checklist. [4][5][6]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [7]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Protected trees (oaks 10 inches or more in diameter, other species 15 inches or more, per the City’s summary) need a removal permit from Parks and Recreation before removal or major pruning. Construction in a tree protection zone needs an ISA-certified arborist’s Tree Protection Plan. [8][9]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [10][11]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [10]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [12]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [13][14]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- A new two-story house, or a replacement house after substantial removal of the existing home, needs Single-Family Dwelling Design Review (SFDDR) under §27.08.032. [15]
- The City’s planning application form lists the SFDDR deposit at $4,000. [16]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Second-story additions and substantial removals can trigger SFDDR; check §27.08.032 before you design. [15]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [17]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Building permit fees (updated annually):
ADU New Construction: $2,831.57
ADU Remodel: $2,031.12
Eligible Manufacture, Pre-Fab, or Pre-Approved: $1,455.43
JADU: $1,454.02
School impact fees: $4.08/sq ft for ADU equal to or over 750 sq ft of new floor area
Public works fee: wastewater capacity charge of $5.95 / sq ft for detached ADUs or ADUs that include expansion of an existing structure by 150 sq.ft. or more
Other utility connection fees: no connection fees required for JADUs/attached ADUs [1] - Per the ADU Resource Center, San Mateo charges school impact fees of $4.08 per sq ft for ADUs of 750 sq ft or more of new floor area. [1]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [18]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [2]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [19][20]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [19]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [19]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists San Mateo among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [21][22]
- San Mateo adopted reach codes for the 2025 code cycle (Ordinance 2026-04). WestLight Energy notes San Mateo’s reach code includes requirements for existing buildings. [23][21]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [14][24]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [25]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [25]
Not published or not verified
- The SFDDR deposit amount comes from the City’s application form; confirm the current amount.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): San Mateo local ADU rules (source page updated October 29, 2026)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of San Mateo: Ordinance 2022-10 (Senate Bill 9)
- San Mateo Municipal Code §27.21.140: Urban Lot Split Development Standards
- City of San Mateo: SB 9 Subdivision Application Submittal Requirements Checklist (PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- City of San Mateo: Protected Trees
- San Mateo Municipal Code §13.40.090: Pruning and removal of protected trees
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- San Mateo Municipal Code §27.08.032: Single Family Dwelling Design Review
- City of San Mateo: Planning Application Form (PDF)
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- City of San Mateo: Ordinance 2026-04, Reach Codes for the 2025 Code Cycle
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance