Building, remodeling or rebuilding a home in San Mateo, CA

San Mateo County · every fact links to an official or primary source · last checked 2026-11-18

Quick answer: San Mateo publishes the most detailed numbers in the county: ADU building permit fees from about $1,455 to $2,832, Single-Family Dwelling Design Review for new two-story or replacement homes (deposit listed at $4,000), an SB 9 ordinance (2022-10), and protected-tree permits for oaks of 10 inches or more and other trees of 15 inches or more.

On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources

Building and planning contacts

ADU contact listed by the county ADU Resource Center: 650.522.7212 – planning@cityofsanmateo.org
Local ADU Website
ADU Ordinance [1]

ADU and JADU rules

This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 29, 2026 [1]. Confirm details with the city before you design.

SizeMin: None.
Max ADU: No fixed maximum; ADUs over 800 sq ft are limited by the underlying zoning FAR (at least 800 sq ft allowed). An ADU may not be larger than the primary home (on multifamily lots, the smallest unit); if the primary is 800 sq ft or less, an 800 sq ft ADU is still allowed.
Conversion ADU: No size limit; may expand up to 150 sq ft for ingress/egress.
Max JADU: 500 square feet, including attic and basement areas.
HeightDetached ADUs: 18 feet to top plate; 24 feet to roof peak.
Attached ADUs: 24 feet to top plate; 32 feet to roof peak. Measured from existing grade.
Two-story units are allowed provided they meet these standards.
SetbacksSide and rear: 4 feet for new construction, including ADUs above an existing garage.
Front: Set by underlying zoning; none for a state-exempt ADU.
No setback: Conversions built in the same location and to the same dimensions as an existing garage or accessory structure, or a detached ADU in the rear one-third of the lot meeting the accessory-structure yard rules (Ch. 27.70).
Separation (multifamily lots): Detached ADUs at least 4 feet from the primary structure, open to the sky.
Daylight plane (nonexempt ADUs): Meet R1 daylight plane from the nearest side and rear property lines.
ParkingJADUs and ADUs: No parking required. Garage, carport, or parking spaces converted or demolished for an ADU/JADU need not be replaced. Voluntary parking allowed on the same lot (up to 2 stalls per unit; garage, carport, uncovered, or tandem).
Owner occupancyJADUs: Required only if the JADU shares sanitation facilities with the main home; owner may live in either unit. Not required if the JADU has its own sanitation, or the owner is a government agency, land trust, or housing organization.
ADUs: Not required.
Process & timelineOnly a ministerial building permit required, review includes Planning, Public Works, Building, Fire, and Arborist (if the construction involves removal of trees).
ExceptionsApplicants may request discretionary review by the Zoning Administrator for ADUs that do not meet objective standards (e.g., height, setback, daylight plane, second-story decks). It cannot be used to exceed the lot’s maximum floor area. Approval requires all of these findings:
the ADU is consistent with the objective design standards in the adopted R1 Single-Family Dwelling Design Guidelines;
it would not negatively affect public health, safety, or welfare;
for height, setback, or daylight plane deviations, exceptional circumstances make compliance an undue hardship and deviations are minimized;
for second-story decks over 50 sq ft, the deck is located, oriented, and screened to minimize views into neighbors’ windows and yards;
and the ADU is consistent with the General Plan.
Decisions may be appealed to the City Manager or designee.
Other local requirementsSale & rental: JADUs may not be sold separately; ADUs may not be sold separately except as allowed by Gov. Code §66341. Units may be rented, but short-term rentals (under 30 days) are prohibited. JADUs require a recorded deed restriction.
Fire safety: New ADUs (attached and detached) require sprinklers if the main dwelling has sprinklers or if over 1,200 sq ft (total area). Attached ADUs also require sprinklers if 50% or more of the main dwelling is being rebuilt or added. JADUs: no sprinklers unless a “substantial remodel”; linked smoke alarm and carbon monoxide detector required. Contact the Fire Department at 650.522.7940 for additional questions.
Architectural standards (nonexempt ADUs): Second-story windows within 5 ft of a residential lot line glazed (obscured) up to 5 ft from finish floor; 5-ft setback for exterior staircases, with landing limited to the minimum required; no rooftop decks; second-story decks no larger than 50 sq ft, outside underlying zoning setbacks, and not facing adjacent residential properties.
Access: ADUs need a separate exterior entrance (interior access optional). JADUs need a separate exterior entrance and must be within the home (including an attached garage); interior access required if sanitation or utility controls are shared; efficiency kitchen required.
Utility connections: Not required for conversion ADUs or JADUs; the City may require separate connections for other ADUs. ADUs are not considered new residential units for calculating City connection fees or capacity charges, unless built with a new primary home.
Each ADU/JADU needs a separate address.
Zones allowedADUs: Lots in all zoning districts that allow residential uses.
JADUs: Lots zoned for single-family use or with an existing or proposed single-family home; not allowed on condominium, townhouse, or multifamily lots.
Minimum lot size0

SB 9: two units or a lot split

Tearing down an old house and building a new one

City demolition permit and local restrictions

Steps every teardown needs (regional and state rules)

Design review, floor area and height for the new house

Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.

Remodels and additions

Fees the city publishes

Seismic retrofit programs

Electrification rules and PG&E service

Typical cost context (published estimates only)

Not published or not verified

Planning a build, ADU, SB 9 split or remodel?

Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.

Get a free build/remodel consultation

Bay Build Guide is an information service, not a licensed contractor. We do not perform construction.

Sources

Every item was checked on the date shown. Rules change, so confirm with the city before you design or apply.

  1. San Mateo County ADU Resource Center (21 Elements): San Mateo local ADU rules (source page updated October 29, 2026) · last checked 2026-11-18
  2. California HCD: ADU Handbook (March 2026, PDF) · last checked 2026-11-18
  3. California HCD: Accessory Dwelling Units (state ADU program page) · last checked 2026-11-18
  4. City of San Mateo: Ordinance 2022-10 (Senate Bill 9) · last checked 2026-11-18
  5. San Mateo Municipal Code §27.21.140: Urban Lot Split Development Standards · last checked 2026-11-18
  6. City of San Mateo: SB 9 Subdivision Application Submittal Requirements Checklist (PDF) · last checked 2026-11-18
  7. California HCD: SB 9 Fact Sheet (PDF) · last checked 2026-11-18
  8. City of San Mateo: Protected Trees · last checked 2026-11-18
  9. San Mateo Municipal Code §13.40.090: Pruning and removal of protected trees · last checked 2026-11-18
  10. Bay Area Air District: Asbestos Frequently Asked Questions (PDF) · last checked 2026-11-18
  11. Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation) · last checked 2026-11-18
  12. U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program · last checked 2026-11-18
  13. PG&E: Gas Service Projects (gas disconnect guide, PDF) · last checked 2026-11-18
  14. PG&E: Building and Renovation Services · last checked 2026-11-18
  15. San Mateo Municipal Code §27.08.032: Single Family Dwelling Design Review · last checked 2026-11-18
  16. City of San Mateo: Planning Application Form (PDF) · last checked 2026-11-18
  17. 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes · last checked 2026-11-18
  18. California Education Code §17620 (school facility fees on residential construction) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  19. California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story) · last checked 2026-11-18
  20. California Residential Mitigation Program: Program ZIP code search · last checked 2026-11-18
  21. WestLight Energy (San Mateo County community energy provider): Reach Codes · last checked 2026-11-18
  22. County of San Mateo: Summary of New Construction Reach Code (PDF) · last checked 2026-11-18
  23. City of San Mateo: Ordinance 2026-04, Reach Codes for the 2025 Code Cycle · last checked 2026-11-18
  24. PG&E: Building and Renovation application resources · last checked 2026-11-18
  25. San Mateo County ADU Resource Center: Budgeting & Finance · last checked 2026-11-18