Building, remodeling or rebuilding a home in San Francisco, CA
Quick answer: San Francisco has two ADU paths (State and Local programs), ministerial SB 9 in RH-1 zones, and some of the toughest teardown rules in California: removing a home generally needs Conditional Use Authorization under Planning Code §317, buildings 45+ years old get historic review, and every new building must be all-electric.
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- DBI Permit Services: 49 South Van Ness Ave., 2nd floor, San Francisco, CA 94103; (628) 652-3240. [1]
- San Francisco Permit Center general line: (628) 652-4900. [2]
ADU and JADU rules
- Two programs. The State program (Planning Director Bulletin No. 3) follows state ADU law; for a detached ADU on a single-family lot that means up to 800 sq ft, 4-ft side and rear setbacks and a 16-ft height. The Local program allows more flexibility, but needs Planning review and a Planning Approval Letter before you file with DBI. [3][4][5]
- State-program ADUs with no unrelated work go to a virtual Permit Review Roundtable (DBI, Planning, Public Works, Fire and the PUC), which the City says generally has a shorter review and issuance timeline than the Local program, at no extra fee. ADUs have a legally mandated 60-day review period. [5]
- Local-program ADUs in tenant-occupied buildings: the owner must post and deliver a Notice of Addition of ADU and a sworn Declaration at least 15 calendar days before applying and file them with the Rent Board; tenants have 30 days to object. [6][5]
- Statewide rules apply: decisions within 60 days of a complete application, and no impact fees on ADUs of 750 sq ft or less (or JADUs of 500 sq ft or less). [7]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [7][8]
SB 9: two units or a lot split
- SB 9 lets RH-1, RH-1(D) and RH-1(S) lots get ministerial approval for up to two units or an urban lot split. The original lot must be at least 2,400 sq ft; each new lot at least 1,200 sq ft and 40%–60% of the original. The applicant must live in one unit for three years unless a community land trust or qualified nonprofit applies. [9][10][11]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [12]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Conditional Use Authorization. Removing a residential unit through demolition, merger or conversion, including alterations “tantamount to demolition,” generally requires Conditional Use Authorization from the Planning Commission under Planning Code §317. [13][14]
- A residential demolition permit generally cannot be issued until the permit for the replacement building is finally approved, unless the building is a serious and imminent hazard. [13]
- Historic review. Check your property’s historic status (Category A, B or C) first. For a Category B building (45 years or older and not yet evaluated), a proposed demolition needs a consultant-prepared Historic Resource Evaluation with the Historic Resources Review application. Designated landmarks and buildings in conservation districts also need a Permit to Demolish under Article 11. [15][16][17]
- Trees. A significant tree on private property (trunk within 10 ft of the public right-of-way and meeting a size threshold) needs a Public Works removal permit, including for construction. New buildings generally must plant street trees (one per 20 ft of frontage). New buildings, added units or garages, new curb cuts, or additions of 500 gross sq ft or more must file a Tree Requirement Worksheet and Existing Tree Disclosure with the permit. [18][19][5]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [20][21]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [20]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [22]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [23][24]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New buildings and large additions in San Francisco go through Planning review (often with neighborhood notification) before DBI plan check. Height and bulk limits depend on the zoning district and height district for your lot; use the Planning Department’s property tools to look them up. [15][14]
- The specific residential design guideline and notification steps for your lot were not summarized here; ask the Permit Center. [2]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Full-permit projects need architectural, structural and MEP plans plus Title 24 energy compliance, and pay at least a filing fee and an issuance fee. All plan review is electronic (Bluebeam), and structural work often needs special inspections. [5]
- From July 1, 2026, some major renovations must convert the building to all-electric (a significant structural or non-structural alteration, or a substantial-improvement addition, combined with a major heating or hot-water system upgrade). [25]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [26]
Fees the city publishes
- DBI building permit fees are set by Building Code Table 1A-A, based on project valuation, as a plan review fee plus a permit issuance fee. [27][28]
- School impact fees: DBI calculates San Francisco Unified School District fees from your permit application; questions go to schoolimpactfee@sfusd.edu. [5]
- ADUs of 750 sq ft or less are exempt from impact fees under state law. [7]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [29]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [7]
Seismic retrofit programs
- Mandatory Soft Story Retrofit Program: applies to wood-frame (Type V) buildings with five or more units and three or more stories (or two over a basement or underfloor area above grade) whose original permit was applied for before January 1, 1978 and that were not already strengthened. [30][31]
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [32][33]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [32]
Electrification rules and PG&E service
- All permit applications filed on or after June 1, 2021 for new buildings must be all-electric. No gas piping is allowed for space heating, water heating, cooking, lighting or clothes drying, and the building must stay all-electric. [25]
- From July 1, 2026, qualifying major renovations must also go all-electric; see Administrative Bulletin 112 for details and exemptions. [25]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [24][34]
Typical cost context (published estimates only)
- SF.gov says it typically costs at least $125,000 in materials and labor to add a new unit. Architects and engineers typically add about 10% of construction cost, and City fees run 6–9% of construction cost. These are the City’s estimates, not quotes. [5]
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [35]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [35]
Not published or not verified
- San Francisco water and sewer disconnection steps for a teardown were not checked.
- Local-program ADU size and height limits are not restated here; see Planning’s chart.
- SF residential design guideline and notification steps were not summarized.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- SF.gov: Permit Services at DBI
- SF.gov: San Francisco Permit Center
- SF Planning: Planning Director Bulletin No. 3, State Accessory Dwelling Unit Program
- SF Planning: Local ADU Program Chart Handout
- SF.gov: Get a building permit for an Accessory Dwelling Unit (ADU)
- SF.gov: Accessory Dwelling Units (ADUs) – tenant notice rules
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- SF Planning: Streamlined Housing Development (Senate Bill 9)
- SF Planning: Planning Director Bulletin No. 8, Streamlined Housing Development
- SF Planning: Application for Housing Development Streamlined Approval (SB 9, PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- San Francisco Planning Code §317: Loss of residential units through demolition, merger and conversion
- SF Planning: Zoning Controls on the Removal of Dwelling Units (PDF)
- SF.gov: Check your property’s historic resource status
- SF Planning: Historic Resources Review (HRR) application (PDF)
- San Francisco Planning Code §1110: Alteration or demolition of significant or contributory buildings (Article 11)
- SF Public Works: Significant and Landmark Trees
- San Francisco Public Works Code §806: Planting and removal of street trees
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- SF.gov: All-Electric Buildings in San Francisco
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- SF.gov: Fees for the Department of Building Inspection
- San Francisco Building Code Table 1A-A: Building Permit Fees
- California Education Code §17620 (school facility fees on residential construction)
- San Francisco Existing Building Code Chapter 5E (2022): Mandatory Earthquake Retrofit of Wood-Frame Buildings, §502E Scope (via UpCodes)
- SF.gov: Get a building permit to do a Soft Story retrofit
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance