Building, remodeling or rebuilding a home in San Carlos, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning: planning@cityofsancarlos.org (per the ADU Resource Center). [1]
ADU contact listed by the county ADU Resource Center: Deanna Skaggs – dskaggs@cityofsancarlos.org; planning@cityofsancarlos.org
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 4, 2024 [1]. Confirm details with the city before you design.
| Size | One bedroom or less: 850 square feet Two+ bedrooms: 1000 square feet Conversion of existing legally established detached structures: None JADU: 500 square feet *50% of main home floor area, unless under 800 square feet (state law allows an ADU up to 800 square feet on every property) |
|---|---|
| Height | Detached ADU: 18 + 2 feet to match the main building roof pitch Detached ADU with multistory, multifamily dwelling: 18 feet Detached ADU over or under detached garage: 20 feet Attached second story: determined by base zoning |
| Setbacks | First floor attached and detached: Side and rear – 4 feet, Front: setbacks determined by base zoning district The second floor is attached: determined by the base zoning district The second floor is attached on reversed corner lots: rear – 5 feet |
| Parking | JADUs: Any parking displaced by the construction of a JADU, including full or partial conversion of an existing garage, shall be replaced ADUs: One spot may be required (tandem allowed). No parking is required if ADU involves garage conversion or is: ½ mile walking distance from public transit, in a historic district, or one block from a car-share vehicle; or when on-street parking permits are required but not offered to ADU occupants |
| Owner occupancy | JADUs: Required ADUs built recently (2020-2024): Not required *Where a lot contains both an accessory dwelling unit and a junior accessory dwelling unit, either the single-unit dwelling or the junior accessory dwelling unit shall be owner-occupied |
| Process & timeline | Applicants shall submit the ADU/JADU building permit application to the San Carlos Building Division. Once received by the Building, the submittal is routed to planning and other pertinent departments for plan-check review. After all rounds of reviews are completed and all comments are resolved, the building permit is ready for approval and issuance. For a smoother process, applicants are encouraged to meet with the San Carlos Planning Division before submitting for a building permit. |
| Exceptions | ADUs smaller and up to 800 square feet are exempt from but not limited to floor area ratio (FAR), natural state, creek setback, and lot coverage requirements |
| Other local requirements | No short-term rentals allowed ADUs must conform to all development standards in the Zoning District in which they are proposed. All construction near a creek is subject to the requirements of Chapter 18.14 Stream Overlay District, which requires a 25′ setback from the creek top-of-bank. The setback requirement is waived to allow ADUs of at least 800 square feet. A permit may be required for protected tree removals. JADU: Architectural design, materials, and details should be the same as those of the primary dwelling. No detached JADUs are allowed. Shall be consistent with the objective design standards of the underlying zoning district. Recordation of a deed restriction is required for JADUs |
| Zones allowed | All districts where residential is allowed: RS, RM, and MU |
| Minimum lot size | 0 |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [2][3]
SB 9: two units or a lot split
- Planning approval comes first, then the building permit. A split must create two lots of at least 1,200 sq ft each, neither smaller than 40% of the original, and no flag lot. [4]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [5]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition or construction within ten times a protected tree’s trunk diameter needs an ISA-certified arborist’s Tree Protection Plan approved before grading or construction permits are issued. [6]
- Removing a protected tree, or pruning more than 25% of its canopy, needs a Tree Removal Permit. [7]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [8][9]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [8]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [10]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [11][12]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New-home design review triggers were not checked; ask Planning. [4]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [13]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: ADU (500 sf, garage conversion): ~$7,500
No impact fees are required for JADU/ADUs smaller than 750 square feet [1] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [14]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [2]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [15][16]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [15]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [15]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists San Carlos among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [17][18]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [12][19]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [20]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [20]
Not published or not verified
- The ADU Resource Center’s San Carlos page was last updated November 4, 2024.
- Fee schedule not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): San Carlos local ADU rules (source page updated November 4, 2024)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of San Carlos: Building an Urban Infill Unit (SB 9)
- California HCD: SB 9 Fact Sheet (PDF)
- San Carlos Municipal Code Chapter 18.18: Landscaping (tree protection)
- City of San Carlos: Tree Removal Permit
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance