Building, remodeling or rebuilding a home in Redwood City, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning: planning@redwoodcity.org, (650) 780-7236 (per the ADU Resource Center). [1]
- Building permit submittals go through the Building Division’s online portal. [2]
ADU contact listed by the county ADU Resource Center: planning@redwoodcity.org — 650.780.7236
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 4, 2026 [1]. Confirm details with the city before you design.
| Size | Min: 150 sf. Max new detached ADU: 1,200 sf of interior livable space. Max attached ADU: 50% of the existing primary dwelling, with at least 800 sf allowed. Converted ADU: No unit size limit. State-mandated detached ADU: 800 sf. Max JADU: 500 sf of interior livable space. |
|---|---|
| Height | Attached: 25 ft or the primary dwelling’s height limit, whichever is lower; at least two stories allowed if within that limit. Detached: 16 ft. Detached near transit: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, plus 2 ft to match the primary dwelling’s roof pitch. Detached with multifamily: 18 ft on a lot with a multistory multifamily dwelling. |
| Setbacks | New Construction: 4 ft side and rear. Converted ADUs: No setback for an ADU within existing space, or a new structure in the same location and dimensions as an existing structure; fire and safety setbacks apply. Front: Cannot prevent an ADU of up to 800 sf with 4 ft side and rear setbacks. State-mandated detached ADUs may be in the front setback. Multifamily: An existing building with side or rear setbacks under 4 ft need not be modified. |
| Parking | JADUs: No parking required, including attached garage conversions. ADUs: State law allows no more than one space per ADU or per bedroom, whichever is less; tandem parking is allowed. No parking may be required for: State-mandated ADUs; ADUs within ½ mile walking distance of public transit; in an architecturally and historically significant historic district; part of the primary residence or an accessory structure; where on-street permits are required but not offered to the occupant; or within one block of a car share vehicle. Replacement parking: Not required when parking is demolished or converted for an ADU. |
| Owner occupancy | ADU: None. JADU: Owner must live in the main dwelling or the JADU if the JADU shares sanitation with the main dwelling. Not required with separate sanitation, or if the owner is a governmental agency, land trust, or housing organization. |
| Process & timeline | Review: Ministerial, with no discretionary review or hearing. The City determines completeness within 15 business days and decides within 60 days of a complete application when a dwelling exists on the lot. Denials must list deficiencies and how to fix them, and may be appealed. Application: Complete the ADU Completeness Checklist, then submit the building permit application and plans through eTrakIt. New detached ADUs schedule a fire flow test; typical lead time is four weeks. The ADU Homeowner Survey is required to finalize the building permit. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. Deed restrictions for JADUs are required to be notarized by the owner of the property. Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). |
| Exceptions | State-mandated ADUs: Subject only to the standards in Gov. Code §66323, not other zoning or design standards. 800 sf protection: Lot coverage, floor area ratio, front setback, and size limits cannot prevent an ADU of up to 800 sf with 4 ft side and rear setbacks. People with disabilities may apply for a waiver of the rules. |
| Other local requirements | Fire sprinklers: Required only if required for the existing primary residence. An ADU or JADU cannot trigger them in the primary residence. Site-specific items: New detached ADUs need a fire flow test. Foundation design applies in hillside or bay mud areas. Others may include Wildland Urban Interface areas, school district notification, Construction and Demolition recycling form for projects over $50,000 valuation, CALGreen checklist, standard BMP plan, and size and location of utilities. Design: Only objective standards may apply. Rentals: Terms must be longer than 30 days. If any structure on the lot is historic, additional standards may apply. |
| Zones allowed | ADUs: All residential and mixed-use zones, on lots with a proposed or existing single-family or multifamily dwelling. JADUs: Single-family lots only, within the walls of the residence. |
| Minimum lot size | 0 |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- Planning publishes SB 9 handouts and checklists on its Planning Permits, Fees & Handouts page. SB 9 approval does not replace building permits. [5][2]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [6]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Protected trees need a removal permit; contact the City arborist at trees@redwoodcity.org. Expect an arborist report, protection plan and replacement trees. [7]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [8][9]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [8]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [10]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [11][12]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- Article 48 sets the floor area ratio for single-family homes. [13]
- The Residential Design Guide covers massing, setbacks, roof form, facade articulation, garage placement and landscaping for new homes and additions. [14]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- See Permit Submittal for what the Building Division needs. [2]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: 400 square feet – Attached Addition: $4,400
999 square feet – On 2nd Floor: $5,800
Carport Conversion: $3,738
Base Fees**
0 to 400 sq ft or converting existing garage to new ADU $3,469
401 to 600 sq ft $4,042
601 to 800 sq ft $4,615
**Minor admin fees also apply [1] - Redwood City’s planning fees are on the Planning Permits, Fees & Handouts page. [5]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Redwood City among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [19][20]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [12][21]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [22]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [22]
Not published or not verified
- The protected-tree size threshold was not confirmed from the City page.
- Redwood City’s pages have blocked automated checks before; some details come from search-indexed copies.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Redwood City local ADU rules (source page updated November 4, 2026)
- City of Redwood City: Permit Submittal (Building Division)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Redwood City: Planning Permits, Fees & Handouts
- California HCD: SB 9 Fact Sheet (PDF)
- City of Redwood City: Tree Maintenance (pruning & removing trees)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Redwood City Zoning Code Article 48: Floor Area Ratio for Single-Family Homes
- City of Redwood City: Residential Design Guide
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance