Building, remodeling or rebuilding a home in Portola Valley, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning & Building: planbuild@portolavalley.net (per the ADU Resource Center). [1]
ADU contact listed by the county ADU Resource Center: planbuild@portolavalley.net
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 16, 2026 [1]. Confirm details with the city before you design.
| Size | Converted existing floor area: No size limit. New floor area, attached or detached: 1,200 sf of interior livable space. State-exempt detached ADU: Up to 800 sf. Multifamily state-exempt units: Not subject to the 1,200 sf limit. Garages, carports, covered porches and patios, and breezeways are not counted. Max JADU: 500 sf, plus up to 150 sf expansion for ingress/egress. |
|---|---|
| Height | Converted existing floor area: No height limit. Attached: 25 ft or the zoning district maximum, whichever is lower; no more than two stories. Detached: 16 ft. Detached near transit or with multifamily: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, or on a lot with a multistory multifamily dwelling; plus 2 ft to match the primary dwelling’s roof pitch (up to 18 or 20 ft). |
| Setbacks | New attached and detached ADUs: Side and rear 4 ft; front same as the zoning district, including scenic corridor setbacks. State-exempt units: No front setback. Conversions and replacements: No setbacks for ADUs within existing living area or an existing accessory structure, or replacing a structure in the same location and dimensions. |
| Parking | ADUs and JADUs: No parking required. If parking is provided, it must meet the Town’s parking dimension standards (§18.60.020). Replacement parking: Not required when a garage, carport, or parking space is demolished or converted for an ADU or JADU. |
| Owner occupancy | ADU: Not required. JADU: Required only if the JADU shares sanitation with the primary dwelling; the owner may live in the JADU or the primary dwelling. Not required with separate sanitation, or if owned by a governmental agency, land trust, or housing organization. A deed restriction must be filed with the Town. |
| Process & timeline | Review: All ADUs and JADUs need a building permit and are reviewed ministerially, with no discretionary review or hearing. Completeness: Written determination within 15 business days, listing any missing items. Decision: Within 60 days of a complete application, or deemed approved; may wait for a new primary dwelling’s application. Denial: Written list of deficiencies and how to fix them. Appeals: Incompleteness or denial may be appealed; final written decision within 60 business days. Demolition: A detached garage demolition permit is issued with the ADU permit. Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | State-exempt units: May exceed AMFA, lot coverage, FAR, or CAR by the minimum amount needed, and have no front setback. Nonconforming conditions: Not a reason for denial unless they threaten health and safety or are affected by the ADU. Health and safety: The Town may deny an ADU only as state law allows for health and safety impacts. |
| Other local requirements | Separate entrance: ADUs and JADUs need an exterior entrance separate from the primary dwelling. Separate address: Required, except for JADUs with an interior entry to the home. Fire sprinklers: Not required unless required for the primary residence; an ADU or JADU does not trigger them in the existing home. Design (local-standard ADUs): Colors with light reflectivity of 40% or less (50% for trim and roofs); entrance lighting up to 700 lumens; landscaping from the Town’s native plants list. State-exempt ADUs are encouraged but not required to comply. Site improvements: Grading, driveways, patios, and decks beyond the minimum needed for a state-exempt ADU follow the zoning district’s rules. Utilities: Connection to public utilities or adequate well and septic; private septic needs health officer approval; new separate connections must be underground. Sale and rental: No separate sale except as state law allows; no rentals under 30 days. JADUs: Efficiency kitchen; interior entry if no bathroom; not a separate unit for fire and life safety rules. Building code: No Group R occupancy change; no passageway required. Depending on amount of grading, topography of the site, geologic conditions, and fire safety considerations, additional reports may be required. |
| Zones allowed | ADUs: Lots with an existing or proposed single-family or multifamily dwelling in areas zoned to allow residential use. JADUs: Single-family residential zones. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [2][3]
SB 9: two units or a lot split
- SB 9 units are exempt from ASCC review; the Planning and Building Director reviews them against the Town’s SB 9 objective standards checklist. Use the SB 9 Residential Development Application. [4][5]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [6]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- A demolition permit is required to remove an existing building or structure. [7]
- A Site Development Permit may be needed if grading, fill, vegetation removal or tree impacts exceed the Town’s thresholds. [8]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [9][10]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [9]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [11]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [12][13]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New homes are generally reviewed by the ASCC under Chapter 18.64. [4]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Building application forms and checklists. [14]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: 800 square feet detached ADU (2022): Town fees $11,800 (including geologic review). Fire and Environmental Health fees additional.
Sewer Connection Charges include Connection Fee ($430.30 per fixture unit) and a permit fee ($510).
*No town impact fees. No impact fees for ADUs under 750 square feet. [1] - Per the ADU Resource Center: an 800 sq ft detached ADU (2022) paid about $11,800 in Town fees including geologic review, with fire and environmental health fees extra. [1]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [2]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Portola Valley among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [19][20]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [13][21]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [22]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [22]
Not published or not verified
- Fee schedule beyond the ADU sample was not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Portola Valley local ADU rules (source page updated November 16, 2026)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- Portola Valley Municipal Code Chapter 18.64: Architectural and Site Plan Review
- Town of Portola Valley: Planning Applications
- California HCD: SB 9 Fact Sheet (PDF)
- Town of Portola Valley: Building Permit FAQs
- Town of Portola Valley: Planning FAQs
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Town of Portola Valley: Building Applications
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance