Building, remodeling or rebuilding a home in Pacifica, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- ADU contacts listed by the ADU Resource Center: Brianne Harkousha (650) 738-7341, bharkousha@pacifica.gov. [1]
- Building Division. [2]
ADU contact listed by the county ADU Resource Center: Brianne Harkousha: 650. 738.7341 – bharkousha@pacifica.gov
Katie Snodgrass: KSnodgrass@pacifica.gov
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 28, 2026 [1]. Confirm details with the city before you design.
| Size | Minimum: an efficiency unit (approx. 150 sq ft) Attached: studio/one bedroom – 850 sq ft or 50% of the primary dwelling, whichever is greater; two or more bedrooms – 1,000 sq ft or 50% of the primary dwelling, whichever is greater. Detached (single-family or multifamily site): 1,200 sq ft JADU: 500 sq ft (a shared bathroom is not counted) Conversion of existing space: within an accessory structure – no maximum; within the primary home – may not reduce the home below the minimum single-family dwelling size. Within non-livable space of a multifamily building: no maximum. |
|---|---|
| Height | Detached: 25 feet or the primary dwelling’s height, whichever is less; 16 feet if the primary is under 16 feet, or if any part of the ADU is between the primary and the front lot line, under 5 ft from a side lot line, under 10 ft from a street-side lot line, or under 20 ft from the rear lot line. Attached: 35 feet if attached to the primary dwelling; if attached to an accessory structure, 25 feet or the primary’s height, whichever is less; 16 feet under the same conditions as detached. Detached from multifamily: 25 feet or the primary’s height, whichever is less; 16 feet if the primary is under 16 feet, if in front of the primary, or if under 20 ft from the rear lot line. Conversions and JADUs: no height limit. |
| Setbacks | Attached: front – 15 feet (20 feet above a garage); side and rear – 4 feet. Detached: front – 15 feet; side and rear – 4 feet. Conversions of existing space: none; expansions (up to 150 sq ft) need front 15 feet, side and rear 4 feet (no side setback on a corner lot’s street side). JADU: none within existing space; built with a new home – per zoning district; ingress/egress expansions – front 15 feet, side and rear 4 feet. ADUs over 800 sq ft must be at least 10 feet from other buildings. |
| Parking | JADUs: no parking required. ADUs outside the coastal access parking area: one space per unit or per bedroom, whichever is less (tandem, driveway, swing, parallel, or lift allowed). No parking required if: within ½ mile of public transit (straight-line distance to any part of the lot); in an architecturally and historically significant historic district; on-street parking permits are required but not offered to the ADU occupant; a car share vehicle is within one block; the ADU is a studio; or the ADU is attached, a conversion, in or detached from a multifamily building, or detached and 800 sq ft or less. Garage spaces lost to an ADU need not be replaced. Within the coastal access parking area: one space per ADU, the exemptions above do not apply, and all required parking (including replaced garage spaces) must be kept on site. |
| Owner occupancy | JADU: owner must live in the main home as their primary residence while the JADU is occupied by a tenant. Not required if the owner is a government agency, land trust, or housing organization. ADU: none |
| Process & timeline | Ministerial building permit process applying state standards and compliance with City ordinance. In the Coastal Zone, a Coastal Development Permit is required. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | Applicants may pursue variances and parking exceptions through Planning Commission for certain standards. |
| Other local requirements | Units per site: single-family site – 1 ADU and 1 JADU; existing multifamily site – 1 ADU or 25% of existing units (whichever is greater) within non-livable space, plus 2 detached ADUs. Fire sprinklers required only if required for the primary dwelling. Conversion ADUs need no separate utility connection; other ADUs may be required to install one, with a proportionate connection fee. Consult with city if work requires tree removal, work within 50 feet of a tree, or pruning a tree. No short-term rentals: 30 consecutive days minimum for ADUs and JADUs. ADUs and JADUs may not be sold separately from the primary home; JADUs require a recorded deed restriction. JADUs and conversion ADUs require a separate exterior entrance; interior access between units is allowed if each side can lock it independently. The ADU standards in Article 4.5 prevail over other city ADU regulations; underlying-district lot coverage and landscaping apply only to ADUs over 800 sq ft. ADUs may be built in front of the primary home. Certificate of occupancy for the ADU is issued only after the primary home’s, and the unit needs its own address. |
| Zones allowed | Any site zoned for residential use as a permitted use, or zoned commercial where residential is a permitted use (or permitted for the site), with a proposed or existing single-family dwelling or an existing multifamily dwelling. Includes P-D sites where the approved development plan shows residential use. JADUs: same zones, single-family sites only. |
| Minimum lot size | None (ADUs and JADUs allowed on substandard lots, including lots of 3,999 sq ft or less). |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- SB 9 projects get ministerial Planning review when they meet objective standards, then construction permits through the Building Division. [5][6]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [7]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Construction within 50 ft of a protected or heritage tree needs a Tree Encroachment, Protection and Preservation Plan with the building application; removing such a tree needs a separate tree permit with site plans, photos and an arborist report. [8]
- SB 9 projects cannot demolish housing that a tenant occupied in the last three years. [7]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [9][10]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [9]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [11]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [12][13]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- Planning permits that can apply to new homes are listed on the Planning Permits page. [6]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Building Division permit requirements. [2]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [14]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: 2022: 1000 s.f. detached: $13,000
2022: 297 s.f. garage conversion to JADU: $3,800
2021: 934 s.f. attached above existing garage: $17,420
*No impact fees for ADUs less than 750 square feet [1] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [15]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [16][17]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [16]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [16]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Pacifica among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [18][19]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [13][20]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [21]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [21]
Not published or not verified
- Pacifica’s demolition checklist, Coastal Zone permit needs and fee schedule were not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Pacifica local ADU rules (source page updated October 28, 2026)
- City of Pacifica: Building Division
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Pacifica: State Planning Laws (project review)
- City of Pacifica: Planning Permits
- California HCD: SB 9 Fact Sheet (PDF)
- City of Pacifica: Tree Ordinances / Permits
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance