Home › San Mateo County › Millbrae

Building, remodeling or rebuilding a home in Millbrae, CA

San Mateo County · every fact links to an official or primary source · last checked 2026-11-18

Quick answer: Millbrae takes SB 9 lot splits through its online permitting portal, needs a building permit for demolition, and protects heritage trees under Chapter 8.60 (permit, arborist report and replacement plan).

On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources

Building and planning contacts

ADU contact listed by the county ADU Resource Center: Planning Division – 650-259-2341, planning@ci.millbrae.ca.us
Local ADU Website
ADU Ordinance [1]

ADU and JADU rules

This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 16, 2026 [1]. Confirm details with the city before you design.

SizeMin: 150 sf.
Max: 850 sf for a studio or one bedroom; 1,000 sf for more than one bedroom.
Attached to an existing primary dwelling: Also no more than 50% of the primary dwelling’s floor area, excluding garage and shed areas.
Max JADU: 500 sf.
HeightAttached: 25 ft, no more than two stories. On a two-story home, plate height may not exceed the primary dwelling’s.
Detached: 16 ft, one story, with a 9 ft maximum plate height (plus up to 36 inches for a crawlspace).
Detached near transit or with multifamily: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, or on a lot with a multistory multifamily dwelling; plus up to 2 ft to match the primary dwelling’s roof pitch.
JADU: Height limit for a single-family structure.
SetbacksNew attached and detached ADUs: 4 ft side and rear; front per base zoning district.
Separation: At least 5 ft from any single-family, duplex, triplex, or multifamily building, or other accessory structure.
Conversions: No setback for existing legal living area or an accessory structure converted to an ADU, or a new ADU built in the same location and dimensions as an existing legal structure.
ParkingJADUs: No parking required, including replacement of displaced parking.
ADUs: One space per ADU, in addition to the primary dwelling’s parking. Tandem parking and parking in setbacks allowed unless the Director finds them infeasible. No ADU parking required if: Within the proposed or existing primary dwelling or an accessory structure; within ½ mile walking distance of public transit; in an architecturally and historically significant district; on-street parking permits are required but not offered to the occupant; or within one block of a car share vehicle.
Replacement parking: Not required when a garage, carport, or covered parking structure is demolished or converted for an ADU.
Owner occupancyJADU: Under state law, required only if the JADU shares sanitation with the primary dwelling; the owner may live in the main home or the JADU. Not required with separate sanitation, or if the owner is a governmental agency, land trust, or housing organization. Deed restricted.
ADU: Not required
Process & timelineReview: Ministerial, with no discretionary review or hearing; decision within 60 days of a complete application. Under state law, the City must determine completeness in writing within 15 business days; if incomplete, it lists what is missing and how to fix it.
With a new single-family home: The ADU or JADU is acted on after the home is approved and cannot be occupied before it.
Fees: Application fee plus building permit and inspection fees.
Making an appointment to meet with a planner in the initial stages of the project is highly recommended.
ExceptionsMinisterial waiver: Development standards are waived to the extent necessary to approve ADUs and JADUs ministerially under state law.
Rear-half rule: Does not apply if it would preclude an 800 sf, 16 ft ADU with 4 ft side and rear setbacks.
Balconies and decks: The Planning Commission may grant exceptions.
Delayed enforcement: Owners of ADUs built before Ord. No. 782 may request up to a five-year delay in enforcing building standards; applications accepted until January 1, 2030.
Other local requirementsEntrance: ADUs and JADUs must have a separate entrance from the primary dwelling.
Zoning: Underlying district standards apply unless inconsistent with the ADU article.
Design: ADUs and JADUs must match the primary dwelling’s roof, exterior, and window materials, colors, and design, follow residential design standards, and keep the home’s single-family appearance.
Balconies and decks: None facing the nearest side or rear property line, except for ingress and egress.
Sale and rental: No separate sale, except as allowed by state law; no short-term rentals or rentals under 30 consecutive days.
JADUs: Within the walls of the home or a legal garage, with an efficiency kitchen and shared or separate sanitation.
Fire sprinklers: Not required unless required for the primary dwelling.
Utilities: Must be underground; no ADU if water or sewer service is inadequate.
Zones allowedADUs: All areas zoned to allow single-family or multifamily residential use, including R-1, R-1LL, R-2, and R-3. Also an accessory use in the C district and the Downtown Improvement Area.
JADUs: Lots zoned for single-family use.
Minimum lot sizeNone

SB 9: two units or a lot split

Tearing down an old house and building a new one

City demolition permit and local restrictions

Steps every teardown needs (regional and state rules)

Design review, floor area and height for the new house

Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.

Remodels and additions

Fees the city publishes

Seismic retrofit programs

Electrification rules and PG&E service

Typical cost context (published estimates only)

Not published or not verified

Planning a build, ADU, SB 9 split or remodel?

Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.

Get a free build/remodel consultation

Bay Build Guide is an information service, not a licensed contractor. We do not perform construction.

Sources

Every item was checked on the date shown. Rules change, so confirm with the city before you design or apply.

  1. San Mateo County ADU Resource Center (21 Elements): Millbrae local ADU rules (source page updated November 16, 2026) · last checked 2026-11-18
  2. City of Millbrae: Building Permit · last checked 2026-11-18
  3. California HCD: ADU Handbook (March 2026, PDF) · last checked 2026-11-18
  4. California HCD: Accessory Dwelling Units (state ADU program page) · last checked 2026-11-18
  5. City of Millbrae: Senate Bill 9 (SB9) · last checked 2026-11-18
  6. City of Millbrae: SB 9 FAQ (PDF) · last checked 2026-11-18
  7. California HCD: SB 9 Fact Sheet (PDF) · last checked 2026-11-18
  8. Millbrae Municipal Code Chapter 8.60: Tree Protection and Urban Forestry Program · last checked 2026-11-18
  9. City of Millbrae: Tree Removal Permit Application (PDF) · last checked 2026-11-18
  10. Bay Area Air District: Asbestos Frequently Asked Questions (PDF) · last checked 2026-11-18
  11. Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation) · last checked 2026-11-18
  12. U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program · last checked 2026-11-18
  13. PG&E: Gas Service Projects (gas disconnect guide, PDF) · last checked 2026-11-18
  14. PG&E: Building and Renovation Services · last checked 2026-11-18
  15. 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes · last checked 2026-11-18
  16. California Education Code §17620 (school facility fees on residential construction) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  17. California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story) · last checked 2026-11-18
  18. California Residential Mitigation Program: Program ZIP code search · last checked 2026-11-18
  19. WestLight Energy (San Mateo County community energy provider): Reach Codes · last checked 2026-11-18
  20. County of San Mateo: Summary of New Construction Reach Code (PDF) · last checked 2026-11-18
  21. PG&E: Building and Renovation application resources · last checked 2026-11-18
  22. San Mateo County ADU Resource Center: Budgeting & Finance · last checked 2026-11-18