Building, remodeling or rebuilding a home in Millbrae, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning Division: (650) 259-2341, planning@ci.millbrae.ca.us (per the ADU Resource Center). [1]
- Building permit information. [2]
ADU contact listed by the county ADU Resource Center: Planning Division – 650-259-2341, planning@ci.millbrae.ca.us
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 16, 2026 [1]. Confirm details with the city before you design.
| Size | Min: 150 sf. Max: 850 sf for a studio or one bedroom; 1,000 sf for more than one bedroom. Attached to an existing primary dwelling: Also no more than 50% of the primary dwelling’s floor area, excluding garage and shed areas. Max JADU: 500 sf. |
|---|---|
| Height | Attached: 25 ft, no more than two stories. On a two-story home, plate height may not exceed the primary dwelling’s. Detached: 16 ft, one story, with a 9 ft maximum plate height (plus up to 36 inches for a crawlspace). Detached near transit or with multifamily: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, or on a lot with a multistory multifamily dwelling; plus up to 2 ft to match the primary dwelling’s roof pitch. JADU: Height limit for a single-family structure. |
| Setbacks | New attached and detached ADUs: 4 ft side and rear; front per base zoning district. Separation: At least 5 ft from any single-family, duplex, triplex, or multifamily building, or other accessory structure. Conversions: No setback for existing legal living area or an accessory structure converted to an ADU, or a new ADU built in the same location and dimensions as an existing legal structure. |
| Parking | JADUs: No parking required, including replacement of displaced parking. ADUs: One space per ADU, in addition to the primary dwelling’s parking. Tandem parking and parking in setbacks allowed unless the Director finds them infeasible. No ADU parking required if: Within the proposed or existing primary dwelling or an accessory structure; within ½ mile walking distance of public transit; in an architecturally and historically significant district; on-street parking permits are required but not offered to the occupant; or within one block of a car share vehicle. Replacement parking: Not required when a garage, carport, or covered parking structure is demolished or converted for an ADU. |
| Owner occupancy | JADU: Under state law, required only if the JADU shares sanitation with the primary dwelling; the owner may live in the main home or the JADU. Not required with separate sanitation, or if the owner is a governmental agency, land trust, or housing organization. Deed restricted. ADU: Not required |
| Process & timeline | Review: Ministerial, with no discretionary review or hearing; decision within 60 days of a complete application. Under state law, the City must determine completeness in writing within 15 business days; if incomplete, it lists what is missing and how to fix it. With a new single-family home: The ADU or JADU is acted on after the home is approved and cannot be occupied before it. Fees: Application fee plus building permit and inspection fees. Making an appointment to meet with a planner in the initial stages of the project is highly recommended. |
| Exceptions | Ministerial waiver: Development standards are waived to the extent necessary to approve ADUs and JADUs ministerially under state law. Rear-half rule: Does not apply if it would preclude an 800 sf, 16 ft ADU with 4 ft side and rear setbacks. Balconies and decks: The Planning Commission may grant exceptions. Delayed enforcement: Owners of ADUs built before Ord. No. 782 may request up to a five-year delay in enforcing building standards; applications accepted until January 1, 2030. |
| Other local requirements | Entrance: ADUs and JADUs must have a separate entrance from the primary dwelling. Zoning: Underlying district standards apply unless inconsistent with the ADU article. Design: ADUs and JADUs must match the primary dwelling’s roof, exterior, and window materials, colors, and design, follow residential design standards, and keep the home’s single-family appearance. Balconies and decks: None facing the nearest side or rear property line, except for ingress and egress. Sale and rental: No separate sale, except as allowed by state law; no short-term rentals or rentals under 30 consecutive days. JADUs: Within the walls of the home or a legal garage, with an efficiency kitchen and shared or separate sanitation. Fire sprinklers: Not required unless required for the primary dwelling. Utilities: Must be underground; no ADU if water or sewer service is inadequate. |
| Zones allowed | ADUs: All areas zoned to allow single-family or multifamily residential use, including R-1, R-1LL, R-2, and R-3. Also an accessory use in the C district and the Downtown Improvement Area. JADUs: Lots zoned for single-family use. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- Millbrae publishes an SB 9 page and FAQ; applications are submitted through the City’s online permitting portal. [5][6]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [7]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition requires a building permit. [2]
- Heritage trees need a tree permit under Chapter 8.60; the application asks for an arborist report, justification and a replacement plan. Work in the tree protection zone should be avoided where possible. [8][9]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [10][11]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [10]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [12]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [13][14]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New-home design review triggers were not checked; ask Planning. [2]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- See the Building Permit page for which projects need permits. [2]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: The exact amount of fees vary depending on the specifics of the proposal. No impact fees for projects less than 750 square feet. In addition, other districts provide various services, such as fire, sanitary, water, and schools that may assess a fee. [1]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Millbrae among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [19][20]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [14][21]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [22]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [22]
Not published or not verified
- Whether heritage-tree removals go to the Planning Commission was not confirmed.
- Fee schedule not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Millbrae local ADU rules (source page updated November 16, 2026)
- City of Millbrae: Building Permit
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Millbrae: Senate Bill 9 (SB9)
- City of Millbrae: SB 9 FAQ (PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- Millbrae Municipal Code Chapter 8.60: Tree Protection and Urban Forestry Program
- City of Millbrae: Tree Removal Permit Application (PDF)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance