Building, remodeling or rebuilding a home in Menlo Park, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning: (650) 330-6702, planning@menlopark.gov (per the ADU Resource Center). [1]
- Building Division permits are submitted online; see the City’s New Single-Family Home Requirements page. [2]
ADU contact listed by the county ADU Resource Center: 650.330.6702 – planning@menlopark.gov
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 27, 2026 [1]. Confirm details with the city before you design.
| Size | Detached 66323 unit: 800 sq ft maximum 66314 unit minimum: 150 sq ft 66314 unit maximum: 850 sq ft for one bedroom or less, 1,000 sq ft for more than one bedroom. Attached ADUs are capped at 50% of the existing primary dwelling. Internal ADUs: 500 sf ft minimum, 1,000 sq ft maximum All 66314 units get an additional 100 sq ft if they meet CBC accessibility requirements. JADU: 150 square feet minimum, 500 square feet maximum |
|---|---|
| Height | JADU and Attached: 25 ft or the zoning district limit, whichever is lower. Detached: 16 ft; 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, plus 2 ft for a roof pitch matching the roof pitch of the primary home. 18 ft on lots with a multistory multifamily building. |
| Setbacks | Attached: side and rear – 4 feet Detached: side and rear – 4 feet 66314 units front setback: Per zoning district; setback must yield to the extent necessary to enable the construction of an 800-square-foot ADU with four-foot side- and rear-yard setbacks |
| Parking | JADUs and ADUs: No parking required |
| Owner occupancy | JADUs: Owner occupancy required; not required if the JADU has separate sanitation facilities, or when the owner is a government agency, land trust, or housing organization |
| Process & timeline | Building permit review is required. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). |
| Exceptions | A conditional use permit can modify 66314 standards, except the one-unit limit. Also, no ADU or JADU is allowed on a single-family lot that has both an SB 9 urban lot split and a two-unit development |
| Other local requirements | Lots with existing or proposed single-family developments are entitled to no more than three 66323 Units: one internal ADU, one JADU, and one detached ADU. Only one 66314 Unit is allowed on a lot. Internal Multifamily ADUs: At least one internal ADU and up to 25% of the existing number of multifamily dwelling units Detached Multifamily ADUs: On a lot with an existing multifamily dwelling, not more than eight detached ADUs and not exceed the number of existing units on the lot. On a lot with a proposed multifamily dwelling, not more than two detached ADUs. Daylight plane restrictions may apply. Depending on ADU size and type, permission to exceed FAR and lot coverage maximums may apply. Must provide exterior access separate from the primary dwelling for all ADU/JADUs. Rental term for ADUs: 30 days minimum Individual sale/subdivision not permitted, unless associated with an affordable housing nonprofit per AB587. |
| Zones allowed | Single-family, multifamily, and mixed-use residential zoning districts. JADUs are allowed in single-family districts. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- SB 9 lot splits are filed as parcel map applications with the Engineering Division and approved ministerially if eligible. Building permits for the new units are submitted online to the Building Division. Demolition is not covered by SB 9’s streamlining and needs its own demolition permit. [5]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [6]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- A separate demolition permit is required. [5][7]
- Heritage trees: a permit is required to remove one or prune more than 25%, with a City-approved arborist report. Work inside a heritage tree’s drip line needs an arborist report and approved protection measures. [8][9]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [10][11]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [10]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [12]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [13][14]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- A new two-story house on a substandard lot (below the zoning district’s minimum width, depth or area) needs a Planning Commission use permit before the building permit. [15]
- The Building Division publishes a checklist of requirements for a new single-family home. [2]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The City’s Permit Requirement Definitions page explains which work needs a permit. [7]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [16]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Depends on the specifics of the proposal. No school impact fees for ADUs 500 square feet or smaller. No road impact fees for ADUs 750 square feet or smaller. Sewer Connection Charges include Connection Fee ($430.30 per fixture unit) and a permit fee ($510). Services provided by other districts/agencies may assess a fee. [1]
- Per the ADU Resource Center: no school impact fees for ADUs of 500 sq ft or less, no road impact fees for ADUs of 750 sq ft or less; sewer connection fee $430.30 per fixture unit plus a $510 permit fee (sewer-district charges). [1]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [17]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [18][19]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [18]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [18]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Menlo Park among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [20][21]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [14][22]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [23]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [23]
Not published or not verified
- Menlo Park’s building fee schedule was not copied here.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Menlo Park local ADU rules (source page updated October 27, 2026)
- City of Menlo Park: New Single-Family Home Requirements
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Menlo Park: SB 9 Projects
- California HCD: SB 9 Fact Sheet (PDF)
- City of Menlo Park: Permit Requirement Definitions
- City of Menlo Park: Heritage tree permit applications
- City of Menlo Park: Heritage tree definition and ordinance
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Menlo Park Municipal Code Chapter 16.59: Lots
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance