Building and planning contacts
- Community Development Department: (650) 726-8270 (per the ADU Resource Center). [1]
- Planning applications and forms are on the City’s Applications, Forms, and Documents page. [2]
ADU contact listed by the county ADU Resource Center: Community Development Department – 650.726.8270
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated August 29, 2024 [1]. Confirm details with the city before you design.
| Size | Min: 150 sf, Max one bedroom or less: 850 square feet, Max two or more bedrooms: 1200 square feet |
|---|---|
| Height | Attached two story: 28 feet Attached one story: 20 feet Detached: 16 feet if within rear yard setback; otherwise 20 feet. |
| Setbacks | Side and rear: 4 feet, Front: same as primary dwelling |
| Parking | JADUs: No parking required ADUs: One spot may be required (tandem allowed). No parking required if: ½ mile walking distance from public transit, in a historic district, or one block from a car-share vehicle on-street parking permits are required but not offered to ADU occupant *Unless within parking area designated for coastal access |
| Owner occupancy | Owner must live in the main dwelling or the ADU |
| Process & timeline | If the ADU conforms to the zoning code (setbacks, height, etc.), the approval letter is drafted, notice is provided, and the ADU is approved. If requiring a variance, ADU might be processed through the planning commission. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | None |
| Other local requirements | One ADU or one JADU allowed per property. One JADU may be allowed with one ADU if the ADU does not exceed 850 square feet Short-term rentals are not allowed. New detached ADUs or additions require a Coastal Development Permit. ADUs must comply with all requirements of the underlying zoning district. If the existing single-family dwelling has fire sprinklers, sprinklers required Generally siding, trim, roofing shall match those of the single-family dwelling in terms of color, material, roof pitch, etc. No separate sewer or water connections required, although a separate water meter is required by the water district. Proposals for tree removals must be approved through the City’s tree protection ordinance. |
| Zones allowed | R-1, R-2, R-3, C-D, C-R, C-VS, C-G, PUD, and all mixed-use districts |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [3][4]
SB 9: two units or a lot split
- The California Coastal Act still applies to SB 9 projects in the Coastal Zone, so a Coastal Development Permit may be required. [5][6]
- Whether Half Moon Bay has adopted its own SB 9 ordinance was not confirmed from an official page. [2]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [6]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- In the Coastal Zone, demolition is a form of development under the City’s Local Coastal Development Permit chapter; check whether your teardown needs a CDP. [5]
- Removing or majorly pruning a heritage tree needs a tree permit first; the checklist lists the submittal items, and replacement planting is required. [7]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [8][9]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [8]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [10]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [11][12]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- Design review and floor-area limits were not checked; ask Community Development. [2]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [13]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: ADU 1 (2017, 609 sf, attached): $4,612 (does not include water fee)
ADU 2 (2017, 682 sf, detached): $4,512 (does not include water fee)
Charging impacts for ADUs 750 SF or greater per State law allowances. [1] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [14]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [3]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [15][16]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [15]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [15]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Half Moon Bay among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [17][18]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [12][19]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [20]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [20]
Not published or not verified
- HMB’s SB 9 ordinance status was not confirmed.
- The ADU Resource Center’s HMB page was last updated August 29, 2024.
- Fee schedule not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): Half Moon Bay local ADU rules (source page updated August 29, 2024)
- City of Half Moon Bay: Applications, Forms, and Documents
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- Half Moon Bay Municipal Code Chapter 18.20: Local Coastal Development Permits
- California HCD: SB 9 Fact Sheet (PDF)
- City of Half Moon Bay: Tree Permit Checklist & Submittal Information (PDF)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance