Building, remodeling or rebuilding a home in East Palo Alto, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning staff: planning@cityofepa.org. Building staff: building@cityofepa.org. [1]
ADU contact listed by the county ADU Resource Center: Planning Staff: planning@cityofepa.org
Building Staff: building@cityofepa.org
Local ADU Website
ADU Ordinance [1]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 3, 2026 [1]. Confirm details with the city before you design.
| Size | Min ADU: Efficiency unit under Health & Safety Code §17958.1. Max ADU (new construction, attached or detached): The lesser of 50% of the primary dwelling’s floor area or 1,000 sf, including habitable basement and attic. The 50% limit does not apply to an ADU of 800 sf or less. Protected size: Limits cannot prevent an attached or detached ADU of up to 800 sf with 4 ft side and rear yards, if it meets all other standards. Max JADU: 500 sf |
|---|---|
| Height | Attached: 25 ft or the height limit for the single-family or multiple-family dwelling, whichever is lower; no more than two stories. Detached: 17 ft. Detached near transit: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, plus up to 2 ft to align with the primary dwelling’s roof pitch. Floodproofing: Additional elevation is allowed where required under Municipal Code §15.52.070.A. |
| Setbacks | New Construction: 4 ft side and rear, provided an 800 sf ADU is not prohibited. Front setback per the underlying zoning district, but it cannot prevent an ADU of up to 800 sf with 4 ft side and rear yards. Converted Structures: No setback for existing living area or an existing accessory structure converted to an ADU, or a new ADU built in the same location and to the same dimensions as an existing structure. Separation: A detached ADU must be at least 6 ft from the primary dwelling, provided an 800 sf ADU is not prohibited. Recorded restrictions: ADUs must conform to recorded easements and setbacks. |
| Parking | JADUs: No additional parking. If created in an attached garage, the applicant must replace the off-street parking for the single-family dwelling. ADUs: At least one uncovered off-street space, in addition to the primary dwelling’s spaces. It may be in an existing driveway or tandem unless found not feasible. Covered parking is not required. No ADU parking required if: The ADU is within ½ mile walking distance of public transit, with an always publicly accessible path of travel; is in an architecturally and historically significant historic district; is part of the existing primary residence or an existing accessory structure; on-street parking permits are required but not offered to the occupant; or a car share vehicle is within one block. Replacement parking: Not required when a garage or covered parking structure is demolished for, or converted to, an ADU. Corner lots: A second driveway may be allowed on a single-family zoned corner lot if at least 25 ft from the intersection of the two front property lines and from any other driveway, using permeable pavers. |
| Owner occupancy | JADU: Required; the owner may live in the single-family residence or the JADU. Not required if the owner is another governmental agency, land trust, or housing organization. A recorded covenant is required before the building permit. ADU: None |
| Process & timeline | Review: Preliminary Ministerial Review (PMR) is required before building permit submittal. Applications are approved or denied ministerially, without a hearing, within 60 days of a complete application. If denied, the City lists deficiencies and how to remedy them. PMR for ADUs has no appeal process. If approved, can apply for a building permit. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. With a new dwelling: The ADU or JADU is not acted on until the new dwelling application is approved or denied, and it cannot be occupied before the primary dwelling. Applicant delay: The 60-day period is paused at the applicant’s request. Garage demolition: The demolition permit and detached ADU permit are issued together. Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). |
| Exceptions | 800 sf protection: Limits on percentage of the primary dwelling, lot coverage, floor area ratio, front setback, open space, and size must allow an attached or detached ADU of up to 800 sf with 4 ft side and rear yards, if it meets all other standards. State-mandated units: Listed units under §18.96.030.E are ministerially permitted and need not meet additional zoning or §18.96.050 standards unless specified. Impact fees: No impact fees may be imposed on ADUs under 750 sf; this does not include utility connection fees or capacity charges. Legalization: An unpermitted ADU built before January 1, 2018 may be legalized even if nonconforming, unless correcting a violation is necessary for health and safety. This does not apply to substandard buildings. Design: Standards do not apply where they would prevent the ADU. |
| Other local requirements | ADUs are permitted on sites with multifamily buildings. Check if located in a flood zone and consult your planner. Sale and rental: No short-term rentals under 30 consecutive days. ADUs and JADUs may be rented separately but not sold separately, except certain qualified nonprofit projects. JADU standards: Efficiency kitchen; separate entrance; shared or separate sanitation, with direct access to the main living area if shared. Attached ADU entrance: Common entrance, or a separate entrance at the side or rear whenever feasible. Design: New ADUs must match the primary dwelling’s style, materials, and colors, unless that would prevent the ADU. Attached ADUs must also match roof pitch and form. A detached ADU may instead match at least three of six listed elements. Detached ADUs based on City pre-approved plans are exempt. Windows: Detached ADUs, and attached ADUs in the primary structure’s required setbacks, have placement and privacy limits. Decks and balconies: Second story doors, balconies, and decks may not face adjacent property lines; screening of at least 6 ft is required where listed. Historic sites: ADUs must follow the Secretary of the Interior’s Standards. Building code: Fire sprinklers are not required unless required for the primary dwelling, and no passageway is required. Utilities: Non-conversion ADUs may need a new or separate connection. Unpermitted ADUs: Operating an ADU without a permit is unlawful. |
| Zones allowed | ADUs: Parcels zoned for single-family or multiple-family dwellings, including mixed-use zones. No ADU is permitted without adequate water or sewer service. JADUs: Parcels zoned for single-family dwellings with no more than one existing or proposed single-family dwelling. Not permitted with a multiple-family dwelling, which here includes two-family dwellings. |
| Minimum lot size | None |
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [2][3]
SB 9: two units or a lot split
- Get Planning’s SB 9 approval first (including a tentative parcel map for a lot split), then submit the approved packet with the building permit application. [4][5][6]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [7]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- A demolition permit is required for any building, structure or pool. The application asks for site plans, a utility disconnect letter, air-quality (Air District) clearance, a recycling form and contractor licensing documents. [8]
- Protected trees on private property (trunk 8 inches or more, per the ordinance) need a Tree Removal Permit, a certified arborist report and replacement trees or an in-lieu fee. [9]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [10][11]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [10]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [12]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [13][14]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New-home design review triggers and floor-area limits were not checked; ask Planning. [1]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [15]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Planning Preliminary Ministerial Review: $648 for typical review unless you have a complicated site or project (2023-24 fee schedule)
Average building permit / plan check fees: $4,000 for a $100,000 ADU, $6,000 for a $300,000 ADU
Other City Department fees: Public Works and other agency fees may be required. Talk to Building for more
Ravenswood School Fees: $4.08/square foot. Fees are updated annually (FY23-24). No school fees for ADUs less than 500 square feet.
Development impact fees: are not charged for ADUs under 750 square feet or attached ADUs. Other ADUs pay Parks and Trail and Stormwater fees
Fire District: $230.27 for plan review and inspection
Utility and connection fees: Contact your utility provider for more information
Please consult with the Building Division for estimated ADU building permit fees [1] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [16]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [2]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [17][18]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [17]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [17]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists East Palo Alto among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [19][20]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [14][21]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [22]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [22]
Not published or not verified
- East Palo Alto’s building fee schedule and new-home design rules were not checked.
- The 8-inch protected-tree threshold comes from a search summary of Chapter 18.28; confirm in the code.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- San Mateo County ADU Resource Center (21 Elements): East Palo Alto local ADU rules (source page updated November 3, 2026)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of East Palo Alto: SB 9 – HOME Act
- City of East Palo Alto: SB 9 handout (PDF)
- City of East Palo Alto: SB 9 Compliance Analysis Form and Checklist (2023, PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- City of East Palo Alto: Demolition Permit Application (PDF)
- East Palo Alto Development Code Chapter 18.28: Trees on Private Property
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance