Building, remodeling or rebuilding a home in East Palo Alto, CA

San Mateo County · every fact links to an official or primary source · last checked 2026-11-18

Quick answer: East Palo Alto requires Planning’s SB 9 approval (with a tentative parcel map for splits) before building permits, a demolition permit for any building or pool with utility disconnect and air-quality clearance, and a tree permit plus arborist report for protected trees (trunk 8 inches or more).

On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources

Building and planning contacts

ADU contact listed by the county ADU Resource Center: Planning Staff: planning@cityofepa.org
Building Staff: building@cityofepa.org
Local ADU Website
ADU Ordinance [1]

ADU and JADU rules

This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 3, 2026 [1]. Confirm details with the city before you design.

SizeMin ADU: Efficiency unit under Health & Safety Code §17958.1.
Max ADU (new construction, attached or detached): The lesser of 50% of the primary dwelling’s floor area or 1,000 sf, including habitable basement and attic. The 50% limit does not apply to an ADU of 800 sf or less.
Protected size: Limits cannot prevent an attached or detached ADU of up to 800 sf with 4 ft side and rear yards, if it meets all other standards.
Max JADU: 500 sf
HeightAttached: 25 ft or the height limit for the single-family or multiple-family dwelling, whichever is lower; no more than two stories.
Detached: 17 ft.
Detached near transit: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, plus up to 2 ft to align with the primary dwelling’s roof pitch.
Floodproofing: Additional elevation is allowed where required under Municipal Code §15.52.070.A.
SetbacksNew Construction: 4 ft side and rear, provided an 800 sf ADU is not prohibited.
Front setback per the underlying zoning district, but it cannot prevent an ADU of up to 800 sf with 4 ft side and rear yards.
Converted Structures: No setback for existing living area or an existing accessory structure converted to an ADU, or a new ADU built in the same location and to the same dimensions as an existing structure.
Separation: A detached ADU must be at least 6 ft from the primary dwelling, provided an 800 sf ADU is not prohibited.
Recorded restrictions: ADUs must conform to recorded easements and setbacks.
ParkingJADUs: No additional parking. If created in an attached garage, the applicant must replace the off-street parking for the single-family dwelling.
ADUs: At least one uncovered off-street space, in addition to the primary dwelling’s spaces. It may be in an existing driveway or tandem unless found not feasible. Covered parking is not required.
No ADU parking required if: The ADU is within ½ mile walking distance of public transit, with an always publicly accessible path of travel; is in an architecturally and historically significant historic district; is part of the existing primary residence or an existing accessory structure; on-street parking permits are required but not offered to the occupant; or a car share vehicle is within one block.
Replacement parking: Not required when a garage or covered parking structure is demolished for, or converted to, an ADU.
Corner lots: A second driveway may be allowed on a single-family zoned corner lot if at least 25 ft from the intersection of the two front property lines and from any other driveway, using permeable pavers.
Owner occupancyJADU: Required; the owner may live in the single-family residence or the JADU. Not required if the owner is another governmental agency, land trust, or housing organization. A recorded covenant is required before the building permit.
ADU: None
Process & timelineReview: Preliminary Ministerial Review (PMR) is required before building permit submittal. Applications are approved or denied ministerially, without a hearing, within 60 days of a complete application. If denied, the City lists deficiencies and how to remedy them. PMR for ADUs has no appeal process. If approved, can apply for a building permit. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended.
With a new dwelling: The ADU or JADU is not acted on until the new dwelling application is approved or denied, and it cannot be occupied before the primary dwelling.
Applicant delay: The 60-day period is paused at the applicant’s request.
Garage demolition: The demolition permit and detached ADU permit are issued together.
Must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384).
Exceptions800 sf protection: Limits on percentage of the primary dwelling, lot coverage, floor area ratio, front setback, open space, and size must allow an attached or detached ADU of up to 800 sf with 4 ft side and rear yards, if it meets all other standards.
State-mandated units: Listed units under §18.96.030.E are ministerially permitted and need not meet additional zoning or §18.96.050 standards unless specified.
Impact fees: No impact fees may be imposed on ADUs under 750 sf; this does not include utility connection fees or capacity charges.
Legalization: An unpermitted ADU built before January 1, 2018 may be legalized even if nonconforming, unless correcting a violation is necessary for health and safety. This does not apply to substandard buildings.
Design: Standards do not apply where they would prevent the ADU.
Other local requirementsADUs are permitted on sites with multifamily buildings. Check if located in a flood zone and consult your planner.
Sale and rental: No short-term rentals under 30 consecutive days. ADUs and JADUs may be rented separately but not sold separately, except certain qualified nonprofit projects.
JADU standards: Efficiency kitchen; separate entrance; shared or separate sanitation, with direct access to the main living area if shared.
Attached ADU entrance: Common entrance, or a separate entrance at the side or rear whenever feasible.
Design: New ADUs must match the primary dwelling’s style, materials, and colors, unless that would prevent the ADU. Attached ADUs must also match roof pitch and form. A detached ADU may instead match at least three of six listed elements. Detached ADUs based on City pre-approved plans are exempt.
Windows: Detached ADUs, and attached ADUs in the primary structure’s required setbacks, have placement and privacy limits.
Decks and balconies: Second story doors, balconies, and decks may not face adjacent property lines; screening of at least 6 ft is required where listed.
Historic sites: ADUs must follow the Secretary of the Interior’s Standards. Building code:
Fire sprinklers are not required unless required for the primary dwelling, and no passageway is required.
Utilities: Non-conversion ADUs may need a new or separate connection.
Unpermitted ADUs: Operating an ADU without a permit is unlawful.
Zones allowedADUs: Parcels zoned for single-family or multiple-family dwellings, including mixed-use zones. No ADU is permitted without adequate water or sewer service.
JADUs: Parcels zoned for single-family dwellings with no more than one existing or proposed single-family dwelling. Not permitted with a multiple-family dwelling, which here includes two-family dwellings.
Minimum lot sizeNone

SB 9: two units or a lot split

Tearing down an old house and building a new one

City demolition permit and local restrictions

Steps every teardown needs (regional and state rules)

Design review, floor area and height for the new house

Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.

Remodels and additions

Fees the city publishes

Seismic retrofit programs

Electrification rules and PG&E service

Typical cost context (published estimates only)

Not published or not verified

Planning a build, ADU, SB 9 split or remodel?

Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.

Get a free build/remodel consultation

Bay Build Guide is an information service, not a licensed contractor. We do not perform construction.

Sources

Every item was checked on the date shown. Rules change, so confirm with the city before you design or apply.

  1. San Mateo County ADU Resource Center (21 Elements): East Palo Alto local ADU rules (source page updated November 3, 2026) · last checked 2026-11-18
  2. California HCD: ADU Handbook (March 2026, PDF) · last checked 2026-11-18
  3. California HCD: Accessory Dwelling Units (state ADU program page) · last checked 2026-11-18
  4. City of East Palo Alto: SB 9 – HOME Act · last checked 2026-11-18
  5. City of East Palo Alto: SB 9 handout (PDF) · last checked 2026-11-18
  6. City of East Palo Alto: SB 9 Compliance Analysis Form and Checklist (2023, PDF) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  7. California HCD: SB 9 Fact Sheet (PDF) · last checked 2026-11-18
  8. City of East Palo Alto: Demolition Permit Application (PDF) · last checked 2026-11-18
  9. East Palo Alto Development Code Chapter 18.28: Trees on Private Property · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  10. Bay Area Air District: Asbestos Frequently Asked Questions (PDF) · last checked 2026-11-18
  11. Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation) · last checked 2026-11-18
  12. U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program · last checked 2026-11-18
  13. PG&E: Gas Service Projects (gas disconnect guide, PDF) · last checked 2026-11-18
  14. PG&E: Building and Renovation Services · last checked 2026-11-18
  15. 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes · last checked 2026-11-18
  16. California Education Code §17620 (school facility fees on residential construction) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  17. California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story) · last checked 2026-11-18
  18. California Residential Mitigation Program: Program ZIP code search · last checked 2026-11-18
  19. WestLight Energy (San Mateo County community energy provider): Reach Codes · last checked 2026-11-18
  20. County of San Mateo: Summary of New Construction Reach Code (PDF) · last checked 2026-11-18
  21. PG&E: Building and Renovation application resources · last checked 2026-11-18
  22. San Mateo County ADU Resource Center: Budgeting & Finance · last checked 2026-11-18