Building, remodeling or rebuilding a home in Daly City, CA

San Mateo County · every fact links to an official or primary source · last checked 2026-11-18

Quick answer: Daly City handles demolitions at the Building Division (333 90th St.) with a Pre-Demolition Checklist signed by City staff and PG&E, publishes SB 9 application materials, and has a pre-approved ADU program whose approved plans were listed as “coming soon.”

On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources

Building and planning contacts

ADU contact listed by the county ADU Resource Center: Daly City Planning Division
Phone: 650.991.8033
Planning Counter: open Monday through Friday (excluding holidays) from 8:00am to 5:00pm
Local ADU Website [2]

ADU and JADU rules

This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated March 10, 2025 [2]. Confirm details with the city before you design.

SizeMin: 150 square feet
Max ADU One bedroom or less: 850 square feet
Max ADU Two bedrooms: 1000 square feet
*Not more than 50% of primary dwelling square footage, unless primary dwelling is 50% of primary dwelling is less than 800 square feet.
Max JADU: 500 square feet
HeightDetached: 18 feet, 1 story
Attached: subject to underlying zoning restrictions
SetbacksSide and rear: 4 feet
ParkingNone
Owner occupancyJADU: Required, ADU: not required for ADUs built recently (2020-2024)
Process & timelineA planning application and building permit are required. Design review required. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended.
ExceptionsNone
Other local requirementsDetached ADUs may require a Coastal Development Permit if located within the City’s Resource Protection Zone boundary.
One ADU and JADU per property is allowed per single family dwelling.
A deed restriction called a Certificate of Compliance must be recorded after construction and before occupancy.
Must comply with all requirements of the underlying zoning district.
No short-term rentals
Zones allowedAll residential zones
Minimum lot sizeNone

SB 9: two units or a lot split

Tearing down an old house and building a new one

City demolition permit and local restrictions

Steps every teardown needs (regional and state rules)

Design review, floor area and height for the new house

Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.

Remodels and additions

Fees the city publishes

Seismic retrofit programs

Electrification rules and PG&E service

Typical cost context (published estimates only)

Not published or not verified

Planning a build, ADU, SB 9 split or remodel?

Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.

Get a free build/remodel consultation

Bay Build Guide is an information service, not a licensed contractor. We do not perform construction.

Sources

Every item was checked on the date shown. Rules change, so confirm with the city before you design or apply.

  1. City of Daly City: Permits · last checked 2026-11-18
  2. San Mateo County ADU Resource Center (21 Elements): Daly City local ADU rules (source page updated March 10, 2025) · last checked 2026-11-18
  3. City of Daly City: Planning · last checked 2026-11-18
  4. City of Daly City: Preapproved Accessory Dwelling Units · last checked 2026-11-18
  5. City of Daly City: ADU & JADU Guide (PDF) · last checked 2026-11-18
  6. California HCD: ADU Handbook (March 2026, PDF) · last checked 2026-11-18
  7. California HCD: Accessory Dwelling Units (state ADU program page) · last checked 2026-11-18
  8. City of Daly City: SB9 Application Materials · last checked 2026-11-18
  9. California HCD: SB 9 Fact Sheet (PDF) · last checked 2026-11-18
  10. City of Daly City: Pre-Demolition Checklist (PDF) · last checked 2026-11-18
  11. City of Daly City: Tree Maintenance & Permitting · last checked 2026-11-18
  12. Bay Area Air District: Asbestos Frequently Asked Questions (PDF) · last checked 2026-11-18
  13. Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation) · last checked 2026-11-18
  14. U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program · last checked 2026-11-18
  15. PG&E: Gas Service Projects (gas disconnect guide, PDF) · last checked 2026-11-18
  16. PG&E: Building and Renovation Services · last checked 2026-11-18
  17. City of Daly City: Building · last checked 2026-11-18
  18. 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes · last checked 2026-11-18
  19. California Education Code §17620 (school facility fees on residential construction) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  20. California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story) · last checked 2026-11-18
  21. California Residential Mitigation Program: Program ZIP code search · last checked 2026-11-18
  22. WestLight Energy (San Mateo County community energy provider): Reach Codes · last checked 2026-11-18
  23. County of San Mateo: Summary of New Construction Reach Code (PDF) · last checked 2026-11-18
  24. PG&E: Building and Renovation application resources · last checked 2026-11-18
  25. San Mateo County ADU Resource Center: Budgeting & Finance · last checked 2026-11-18