Building, remodeling or rebuilding a home in Daly City, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Building Division: 333 90th Street, 2nd Floor, Daly City; (650) 991-8061; buildingdivision@dalycity.org. [1]
- Planning Division: (650) 991-8033 (counter open weekdays 8 a.m.–5 p.m., per the ADU Resource Center). [2][3]
ADU contact listed by the county ADU Resource Center: Daly City Planning Division
Phone: 650.991.8033
Planning Counter: open Monday through Friday (excluding holidays) from 8:00am to 5:00pm
Local ADU Website [2]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated March 10, 2025 [2]. Confirm details with the city before you design.
| Size | Min: 150 square feet Max ADU One bedroom or less: 850 square feet Max ADU Two bedrooms: 1000 square feet *Not more than 50% of primary dwelling square footage, unless primary dwelling is 50% of primary dwelling is less than 800 square feet. Max JADU: 500 square feet |
|---|---|
| Height | Detached: 18 feet, 1 story Attached: subject to underlying zoning restrictions |
| Setbacks | Side and rear: 4 feet |
| Parking | None |
| Owner occupancy | JADU: Required, ADU: not required for ADUs built recently (2020-2024) |
| Process & timeline | A planning application and building permit are required. Design review required. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | None |
| Other local requirements | Detached ADUs may require a Coastal Development Permit if located within the City’s Resource Protection Zone boundary. One ADU and JADU per property is allowed per single family dwelling. A deed restriction called a Certificate of Compliance must be recorded after construction and before occupancy. Must comply with all requirements of the underlying zoning district. No short-term rentals |
| Zones allowed | All residential zones |
| Minimum lot size | None |
- Pre-approved ADU program: Daly City accepts model detached-ADU plans from designers. To use one you hire the designer who made it; the design can be mirrored but not modified, and site-specific plans are still required. At last check, approved plans were listed as “coming soon.” [4]
- The City publishes an ADU & JADU guide. [5]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [6][7]
SB 9: two units or a lot split
- Daly City publishes SB 9 application materials; the Planning Division handles lot splits and two-unit projects. [8]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [9]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition applications go to the Building Division with a completed Pre-Demolition Checklist signed by City staff and PG&E, plus photos of the building and adjacent structures. [1][10]
- Tree permits in Daly City cover trees in City rights-of-way and other public property. Whether a private-yard tree needs a permit was not confirmed; check with the City. [11]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [12][13]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [12]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [14]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [15][16]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- New homes may need design review under the zoning ordinance (Chapter 17.45) or in a design review combining district; ask Planning. [3]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The Building page lists permit types and submittal rules. [17]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [18]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Between $500 and $2,500 depending on valuation, which depends on whether the ADU is interior or a freestanding structure. Planning review fee is $614. [2]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [19]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [6]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [20][21]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [20]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [20]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Daly City among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [22][23]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [16][24]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [25]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [25]
Not published or not verified
- Daly City’s pre-approved ADU plans were “coming soon” at last check.
- Private-property tree permit rules were not confirmed.
- The ADU Resource Center’s Daly City page was last updated March 10, 2025.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- City of Daly City: Permits
- San Mateo County ADU Resource Center (21 Elements): Daly City local ADU rules (source page updated March 10, 2025)
- City of Daly City: Planning
- City of Daly City: Preapproved Accessory Dwelling Units
- City of Daly City: ADU & JADU Guide (PDF)
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Daly City: SB9 Application Materials
- California HCD: SB 9 Fact Sheet (PDF)
- City of Daly City: Pre-Demolition Checklist (PDF)
- City of Daly City: Tree Maintenance & Permitting
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- City of Daly City: Building
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance