Building, remodeling or rebuilding a home in Colma, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Planning Department: (650) 757-8888, planning@colma.ca.gov. [1][2]
- Building permit applications go to the Building Department (building@colma.ca.gov per the Town’s Building Permit Services page). [3][4]
ADU contact listed by the county ADU Resource Center: Planning Department
Phone: 650.757.8888
Local ADU Website
ADU Ordinance [5]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 10, 2026 [5]. Confirm details with the city before you design.
| Size | Min ADU: 150 sf. State-exempt detached: Up to 800 sf. State-exempt conversion: May expand up to 150 sf for ingress and egress. Other ADUs, max: At least 850 sf for a studio or one bedroom and 1,000 sf for two or more bedrooms, detached or attached. Attached ADUs on a lot with an existing primary dwelling are also limited to 50% of its floor area. Local limits cannot prevent an 800 sf ADU with 4 ft side and rear setbacks. Max JADU: 500 sf. |
|---|---|
| Height | Attached: 25 ft or the underlying zoning limit, whichever is lower; no more than two stories. Detached: 18 ft. Detached near transit: 18 ft plus 2 ft for roof pitch within ½ mile walking distance of a major transit stop or high-quality transit corridor. Detached with multifamily: 20 ft on a lot with a multistory multifamily dwelling. |
| Setbacks | State-exempt detached: 4 ft side and rear; not subject to front setbacks. State-exempt conversion ADU and JADU: Sufficient for fire and safety. Other ADUs: 4 ft side and rear. Front: 19 ft, and 15 ft from a street-facing property line, but these cannot prevent an ADU of at least 800 sf, even if partly or wholly within the front setback. Rebuilt structures: No setback for an ADU in the same location and dimensions as an existing structure. |
| Parking | ADUs and JADUs: No parking required, new or replacement. Replacement parking is not required when a garage, carport, or parking space is removed for an ADU. Tandem parking and parking in setbacks are allowed. |
| Owner occupancy | ADUs: Not required. JADUs: Required only if the JADU shares sanitation with the primary dwelling; the owner may live in the main home or the JADU. Not required with separate sanitation, or if owned by a governmental agency, land trust, or housing organization. Rentals: Longer than 30 days only. |
| Process & timeline | Review: Ministerial, with no discretionary review or hearing, as part of the building permit process. Completeness: Within 15 business days. Decision: Within 45 days of a complete application; 30 days for detached ADUs using pre-approved plans. Not deemed approved if submitted with a new primary dwelling, which may be acted on first. Denial: Written list of deficiencies and how to fix them. Appeals: Incompleteness or denial may be appealed in writing to the City Clerk; the City Council decides within 45 business days. Garage demolition: Reviewed and issued with the ADU permit. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | State-exempt ADUs and JADUs: Not subject to local standards such as lot coverage, front setbacks, or design standards. 800 sf protection: FAR, lot coverage, size, front setback, and open space limits cannot prevent an 800 sf ADU with 4 ft side and rear setbacks. Nonconforming conditions: Not a basis for denial unless a health or safety threat affected by the ADU. Legalization: Unpermitted ADUs and JADUs built before January 1, 2020 may be legalized unless correction is needed for health and safety or the unit is substandard. |
| Other local requirements | Design (other ADUs): Materials, colors, and roof slope match the primary dwelling; down-lighting only; independent entrance on the side or rear, not facing a public right-of-way; interior at least 10 ft wide with 7 ft walls; no direct line of sight to neighbors; clerestory or obscured windows within 30 ft of a non-street property line; landscaping in 4 ft setbacks and a 5 ft fence with plantings or trellis. Additional ADU design standards in §5.03.156 cover window trim, two materials and two colors per elevation, and hooded dusk-to-dawn lighting. Historic properties: Secretary of the Interior’s Standards. JADUs: Within the walls of the single-family home, including an attached garage; separate exterior access; interior entry if sanitation is shared; efficiency kitchen; deed restriction recorded before the building permit. Building: Sprinklers only if required for the primary residence; an ADU does not change Group R occupancy. Utilities: Direct connection required except for state-exempt conversions; well or septic allowed if adequate. Sale: Separate sale only for qualified nonprofit projects. Certificate of occupancy: Not before the primary dwelling, except after certain declared emergencies. |
| Zones allowed | ADUs: R (Residential), R-S (Sterling Park Neighborhood Residential), and C (Commercial), on lots zoned for single-family or multifamily use with a proposed or existing dwelling. JADUs: Single-family lots only; not allowed on multifamily properties. |
| Minimum lot size | None |
- Complete ADU/JADU applications are decided within 45 days. [2]
- AB 1332: detached ADUs using Colma’s pre-approved plans are decided within 30 days. [6]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [7][8]
SB 9: two units or a lot split
- No Colma-specific SB 9 page was found. State SB 9 rules apply (two units per single-family lot or a split into two lots, ministerial review). [9]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [9]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition work uses the Town’s Construction and Demolition form, filed with the building permit. [10][11]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [12][13]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [12]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [14]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [15][16]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- Design review and floor-area rules for a new house were not checked; ask Planning. [1]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The Building Department’s forms and checklists page lists what to submit. [11]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [17]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: No ADUs built at this time [5]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [18]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [7]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [19][20]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [19]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [19]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Colma among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [21][22]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [16][23]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [24]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [24]
Not published or not verified
- No Colma SB 9 ordinance or page was found.
- Colma’s fee schedule was not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- Town of Colma: Planning Department
- Town of Colma: Accessory Dwelling Units (ADU)
- Town of Colma: Building Permit Services
- Town of Colma: Building Department
- San Mateo County ADU Resource Center (21 Elements): Colma local ADU rules (source page updated November 10, 2026)
- Town of Colma: AB 1332 Pre-Approved ADU Plans Program
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- California HCD: SB 9 Fact Sheet (PDF)
- Town of Colma: Construction and Demolition Form
- Town of Colma: Building Forms & Checklists
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance