Building, remodeling or rebuilding a home in Colma, CA

San Mateo County · every fact links to an official or primary source · last checked 2026-11-18

Quick answer: Colma is a small town with few homes; the ADU Resource Center reports no ADUs built there yet. Complete ADU/JADU applications are decided within 45 days, and detached ADUs using the Town’s pre-approved plans within 30 days. Demolition uses the Town’s Construction & Demolition form.

On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources

Building and planning contacts

ADU contact listed by the county ADU Resource Center: Planning Department
Phone: 650.757.8888
Local ADU Website
ADU Ordinance [5]

ADU and JADU rules

This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated November 10, 2026 [5]. Confirm details with the city before you design.

SizeMin ADU: 150 sf.
State-exempt detached: Up to 800 sf.
State-exempt conversion: May expand up to 150 sf for ingress and egress.
Other ADUs, max: At least 850 sf for a studio or one bedroom and 1,000 sf for two or more bedrooms, detached or attached. Attached ADUs on a lot with an existing primary dwelling are also limited to 50% of its floor area. Local limits cannot prevent an 800 sf ADU with 4 ft side and rear setbacks.
Max JADU: 500 sf.
HeightAttached: 25 ft or the underlying zoning limit, whichever is lower; no more than two stories.
Detached: 18 ft.
Detached near transit: 18 ft plus 2 ft for roof pitch within ½ mile walking distance of a major transit stop or high-quality transit corridor.
Detached with multifamily: 20 ft on a lot with a multistory multifamily dwelling.
SetbacksState-exempt detached: 4 ft side and rear; not subject to front setbacks.
State-exempt conversion ADU and JADU: Sufficient for fire and safety.
Other ADUs: 4 ft side and rear. Front: 19 ft, and 15 ft from a street-facing property line, but these cannot prevent an ADU of at least 800 sf, even if partly or wholly within the front setback.
Rebuilt structures: No setback for an ADU in the same location and dimensions as an existing structure.
ParkingADUs and JADUs: No parking required, new or replacement.
Replacement parking is not required when a garage, carport, or parking space is removed for an ADU. Tandem parking and parking in setbacks are allowed.
Owner occupancyADUs: Not required.
JADUs: Required only if the JADU shares sanitation with the primary dwelling; the owner may live in the main home or the JADU. Not required with separate sanitation, or if owned by a governmental agency, land trust, or housing organization.
Rentals: Longer than 30 days only.
Process & timelineReview: Ministerial, with no discretionary review or hearing, as part of the building permit process.
Completeness: Within 15 business days.
Decision: Within 45 days of a complete application; 30 days for detached ADUs using pre-approved plans. Not deemed approved if submitted with a new primary dwelling, which may be acted on first.
Denial: Written list of deficiencies and how to fix them.
Appeals: Incompleteness or denial may be appealed in writing to the City Clerk; the City Council decides within 45 business days.
Garage demolition: Reviewed and issued with the ADU permit.
Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended.
ExceptionsState-exempt ADUs and JADUs: Not subject to local standards such as lot coverage, front setbacks, or design standards.
800 sf protection: FAR, lot coverage, size, front setback, and open space limits cannot prevent an 800 sf ADU with 4 ft side and rear setbacks.
Nonconforming conditions: Not a basis for denial unless a health or safety threat affected by the ADU.
Legalization: Unpermitted ADUs and JADUs built before January 1, 2020 may be legalized unless correction is needed for health and safety or the unit is substandard.
Other local requirementsDesign (other ADUs): Materials, colors, and roof slope match the primary dwelling; down-lighting only; independent entrance on the side or rear, not facing a public right-of-way; interior at least 10 ft wide with 7 ft walls; no direct line of sight to neighbors; clerestory or obscured windows within 30 ft of a non-street property line; landscaping in 4 ft setbacks and a 5 ft fence with plantings or trellis. Additional ADU design standards in §5.03.156 cover window trim, two materials and two colors per elevation, and hooded dusk-to-dawn lighting.
Historic properties: Secretary of the Interior’s Standards.
JADUs: Within the walls of the single-family home, including an attached garage; separate exterior access; interior entry if sanitation is shared; efficiency kitchen; deed restriction recorded before the building permit.
Building: Sprinklers only if required for the primary residence; an ADU does not change Group R occupancy.
Utilities: Direct connection required except for state-exempt conversions; well or septic allowed if adequate.
Sale: Separate sale only for qualified nonprofit projects.
Certificate of occupancy: Not before the primary dwelling, except after certain declared emergencies.
Zones allowedADUs: R (Residential), R-S (Sterling Park Neighborhood Residential), and C (Commercial), on lots zoned for single-family or multifamily use with a proposed or existing dwelling.
JADUs: Single-family lots only; not allowed on multifamily properties.
Minimum lot sizeNone

SB 9: two units or a lot split

Tearing down an old house and building a new one

City demolition permit and local restrictions

Steps every teardown needs (regional and state rules)

Design review, floor area and height for the new house

Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.

Remodels and additions

Fees the city publishes

Seismic retrofit programs

Electrification rules and PG&E service

Typical cost context (published estimates only)

Not published or not verified

Planning a build, ADU, SB 9 split or remodel?

Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.

Get a free build/remodel consultation

Bay Build Guide is an information service, not a licensed contractor. We do not perform construction.

Sources

Every item was checked on the date shown. Rules change, so confirm with the city before you design or apply.

  1. Town of Colma: Planning Department · last checked 2026-11-18
  2. Town of Colma: Accessory Dwelling Units (ADU) · last checked 2026-11-18
  3. Town of Colma: Building Permit Services · last checked 2026-11-18
  4. Town of Colma: Building Department · last checked 2026-11-18
  5. San Mateo County ADU Resource Center (21 Elements): Colma local ADU rules (source page updated November 10, 2026) · last checked 2026-11-18
  6. Town of Colma: AB 1332 Pre-Approved ADU Plans Program · last checked 2026-11-18
  7. California HCD: ADU Handbook (March 2026, PDF) · last checked 2026-11-18
  8. California HCD: Accessory Dwelling Units (state ADU program page) · last checked 2026-11-18
  9. California HCD: SB 9 Fact Sheet (PDF) · last checked 2026-11-18
  10. Town of Colma: Construction and Demolition Form · last checked 2026-11-18
  11. Town of Colma: Building Forms & Checklists · last checked 2026-11-18
  12. Bay Area Air District: Asbestos Frequently Asked Questions (PDF) · last checked 2026-11-18
  13. Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation) · last checked 2026-11-18
  14. U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program · last checked 2026-11-18
  15. PG&E: Gas Service Projects (gas disconnect guide, PDF) · last checked 2026-11-18
  16. PG&E: Building and Renovation Services · last checked 2026-11-18
  17. 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes · last checked 2026-11-18
  18. California Education Code §17620 (school facility fees on residential construction) · last checked 2026-11-18 (this official page blocks automated checks, so we read it through a search engine’s indexed copy)
  19. California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story) · last checked 2026-11-18
  20. California Residential Mitigation Program: Program ZIP code search · last checked 2026-11-18
  21. WestLight Energy (San Mateo County community energy provider): Reach Codes · last checked 2026-11-18
  22. County of San Mateo: Summary of New Construction Reach Code (PDF) · last checked 2026-11-18
  23. PG&E: Building and Renovation application resources · last checked 2026-11-18
  24. San Mateo County ADU Resource Center: Budgeting & Finance · last checked 2026-11-18