Building, remodeling or rebuilding a home in Burlingame, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Building Division: (650) 558-7260, buildingpermits@burlingame.org. [1]
- Permits are submitted through the City’s online permitting portal. [2]
ADU contact listed by the county ADU Resource Center: Planning Department
Email: planningdept@burlingame.org
Phone: 650.558.7250
Local ADU Website
ADU Ordinance [3]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated July 20, 2026 [3]. Confirm details with the city before you design.
| Size | Up to 1,000 square feet of interior livable space |
|---|---|
| Height | 16 ft detached on a single- or multi-unit lot 18 ft detached if within ½ mile of a major transit stop / high-quality transit corridor (plus an extra 2 ft to match primary roof pitch) 18 ft detached on a lot with a multi-unit, multi-story dwelling 30 ft (25 ft in Hillside Overlay) or the zoning district limit, whichever is lower, for attached ADUs (max 2 stories) |
| Setbacks | Rear / side: 4 feet Conversion ADUs require no setbacks if converted in the same footprint as original structure |
| Parking | JADUs: No parking required ADUs: One spot may be required (tandem allowed). No parking required if: ½ mile distance from public transit, in a historic district, or one block from a car-share vehicle on-street parking permits are required but not offered to ADU occupant it is part of the proposed or existing primary residence or an existing accessory structure when a permit application for an ADU is submitted with an application for a new single or multi-unit dwelling on the same lot |
| Owner occupancy | ADUs: No owner occupancy required JADUs: Owner must live in the main dwelling or the JADU if the JADU lacks its own sanitation facilities |
| Process & timeline | Submit ADU Permit application to Building Division. Application may require revisions. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
| Exceptions | ADUs less than 800 square feet are exempt from floor area ratio (FAR) and lot coverage requirements. |
| Other local requirements | If more than 150 feet from a right-of-way, fire access required. If primary dwelling is required to have sprinklers, ADU needs sprinklers. Separate electrical and water meters may be required by the City. Sewer must connect to the lateral for the main dwelling. One tree must be added per 1,000 SF of floor area on the site, including ADU and main dwelling and any other accessory structures. A tree removal permit is required for removal of protected-size trees. No short-term rentals Deed restriction must be recorded prior to issuance of a building permit |
| Zones allowed | Where single-or multi-unit residential is permitted |
| Minimum lot size | No minimum lot size required |
- AB 1332 program: the City lists one pre-approved ADU, ADORE Homes’ 667 sq ft manufactured ADU (PREADU26-0001). Pre-approval is not a permit; every project still needs site-specific planning and building permits. [4]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [5][6]
SB 9: two units or a lot split
- SB 9 projects use the Two-Unit Residential Overlay application, filed with Planning. A lot split’s parcel map goes to Public Works–Engineering. After approval, submit plans to the Building Division. [7][8]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [9]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- A separate Building Division demolition permit is needed for each structure, with an Air District job number, verification that utilities are disconnected, and an approved recycling and waste-reduction plan. [10]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [11][12]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [11]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [13]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [14][15]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- A new single-family house requires Design Review under Chapter 25.68, which goes to the Planning Commission. [16]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- Major additions can trigger design review under Chapter 25.68. Ask Planning before you design. [16]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [17]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: ADU 1 (570 square feet, converted garage, $30,000 valuation): $3,300
ADU 2 (660 square feet, new detached, $150,000 valuation): $8,250 [3] - School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [18]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [5]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [19][20]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [19]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [19]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Burlingame among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [21][22]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [15][23]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [24]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [24]
Not published or not verified
- Burlingame’s building fee schedule and new-home floor-area limits were not copied here.
- No published demolition or rebuild timeline was found.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- City of Burlingame: Building Division staff directory
- City of Burlingame: Online Permitting Portal & Submittal Instructions
- San Mateo County ADU Resource Center (21 Elements): Burlingame local ADU rules (source page updated July 20, 2026)
- City of Burlingame: AB 1332 Pre-approved ADUs
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Burlingame: Two-Unit Residential Overlay Application (SB 9)
- City of Burlingame: SB 9 Application Checklist (PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- City of Burlingame: Demolition Permit Application Supplement (PDF)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Burlingame Municipal Code Chapter 25.68: Design Review
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance