Building, remodeling or rebuilding a home in Brisbane, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Building Division: 50 Park Place, Brisbane, CA 94005; (415) 508-2120. [1]
- All building permit applications must be filed online through the Clariti Permit Portal. Contractors need a valid Brisbane business license. [2]
ADU contact listed by the county ADU Resource Center: Community Development Department
Email: planning@brisbaneca.org
Phone: 415.508.2120
Local ADU Website
ADU Ordinance [3]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 20, 2026 [3]. Confirm details with the city before you design.
| Size | No Minimum Max ADU New construction: 1,000 square feet (800 sq ft for newly constructed detached state-exempt ADUs; no size limit for state-exempt ADUs created by converting existing space) Max ADU Conversion: 1,000 square feet (no size limit if state-exempt) Max JADU: 500 square feet |
|---|---|
| Height | Attached ADUs: Max. two stories (subject to the height maximum of the underlying zoning district) Detached ADUs: 16 ft on a lot with an existing or proposed single-family or single-story multifamily dwelling 18 ft on a lot with an existing or proposed multistory multifamily dwelling 18 ft on any lot within one-half mile walking distance of a major transit stop or high-quality transit corridor (per Public Resources Code §21155). Note: as of August 2025, no stops in Brisbane currently qualify under the state’s updated High Quality Transit Stops map, so the 16 ft limit applies to most detached ADUs on single-family lots |
| Setbacks | Front: Dependent on underlying zoning district (state-exempt ADUs may be located anywhere in the front setback area) Rear: 4 feet Side: 4 feet or as established in the underlying zoning district, whichever is less No setback required for conversion of an existing legally permitted structure with nonconforming setbacks, or for a new ADU built in the same location/dimensions as such a structure Detached ADUs may have limited encroachments into setbacks for overhanging architectural features (eaves, gutters), open/uncovered stairs, ramps and landings, and supported or cantilevered decks |
| Parking | JADUs & ADUs in R-1, R-2, R-3, NCRO-2, SCRO-1, PAOZ-1, or PAOZ-2 Districts: No parking required ADUs in R-BA and PD Districts: One spot may be required. No parking required if: ½ mile walking distance from public transit the ADU is part of the proposed or existing dwelling or an accessory structure (i.e., conversion ADUs) in a historic district one block from a car-share vehicle, or on-street parking permits are required but not offered to ADU occupant the ADU qualifies as a state-exempt ADU |
| Owner occupancy | ADUs: None JADUs: Owner must occupy primary dwelling or JADU. Owner-occupancy shall not be required if the owner is another governmental agency, land trust, or housing organization. |
| Process & timeline | Building permit review required. Making an appointment to meet with a planner in the initial stages of the project is highly recommended. No design review is required but the separate ADU permit previously required in the R-BA zone has been eliminated; only a building permit is required, and it is processed ministerially within 60 days of a complete application. |
| Exceptions | State-exempt ADUs are exempt from FAR, lot coverage, parking, and landscaping requirements. State-exempt ADUs include: (1) ADUs created within the proposed or existing space of an SFD or accessory structure; (2) newly constructed detached ADUs up to 800 sf; (3) JADUs; (4) ADUs created within existing non-livable space of a multifamily dwelling; (5) multiple detached ADUs on multifamily lots. |
| Other local requirements | Number of ADUs allowed single-family lots: Any combination of (1) one ADU within proposed or existing space of the SFD, (2) one newly constructed detached ADU (≤800 sf), and (3) one JADU. Total dwelling units on lots created via SB 9 (urban lot split or two-unit development) capped at 4. Number of ADUs allowed Multifamily lots: ADUs within existing non-livable space (up to 25% of existing units), PLUS up to 8 detached ADUs on lots with existing multifamily (not to exceed the number of existing primary units), OR up to 2 detached ADUs on lots with proposed multifamily. The lot on which the ADU is located shall have a legal means of access to the public right-of-way California Building Code compliance required for fire safety, including sprinklering if the main dwelling is sprinklered or requires sprinklering due to other proposed work ADUs are subject to the underlying district’s landscaping requirements; state-exempt ADUs are exempt from landscaping requirements Utility connections required; separate meters not required Tree Removal Permit may be required if trees are to be removed. Refer to Ch 12.12 of the code for when notices or permits are required for tree removals. Additional development standards apply per district requirements, including FAR and lot coverage, except that state-exempt ADUs are excluded from FAR and lot coverage calculations Short term rentals prohibited in ADUs and JADUs JADUs: A declaration of restrictions shall be recorded that includes the following: only one unit may be non-owner-occupied, no rentals under 30 days, no separate sale of the JADU, and the approved size and attributes; a copy must be given to prospective purchasers or occupants. |
| Zones allowed | ADUs: R-1, R-2, R-3, R-BA, NCRO-2, SCRO-1, PAOZ-1, PAOZ-2 and PD JADUs: same as above, except PAOZ-2 |
| Minimum lot size | None |
- Plan check is typically 15 business days, and each resubmittal cycle is another 15 business days. JADUs are only allowed inside a single-family home. [4]
- Under Chapter 17.43, ADUs may be up to 1,000 sq ft, with 4-ft rear setbacks and 4-ft side setbacks on lots 40 ft or wider. ADUs of 800 sq ft or less and no more than 16 ft tall are excluded from lot coverage and floor area ratio. Properties in Brisbane Acres (R-BA) also need a Planning ADU permit. [5]
- The City offers a pre-approved plans gallery and an ADU cost calculator. Building permits and site-specific review are still required. [6]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [7][8]
SB 9: two units or a lot split
- An SB 9 two-unit project needs a building permit plus the SB 9 qualifying checklist; an urban lot split first needs a separate ministerial parcel map application. [9][10]
- State rules apply: new lots at least 1,200 sq ft, a three-year owner-occupancy affidavit for lot splits, and no demolition of housing occupied by a tenant in the last three years, rent-controlled or deed-restricted affordable housing. [10][11]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [11]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- Demolition permits are applied for online through Clariti. Brisbane’s handouts include its construction and demolition debris recycling requirements. [2][12]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [13][14]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [13]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [15]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [16][17]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- ADU height follows the underlying zoning district (ADUs limited to two stories). Main-house design review triggers and floor-area limits were not checked; ask Planning. [5]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- A building permit is required for construction work; the City’s Handouts & Forms page lists submittal requirements by project type. [12][2]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [18]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Detached ADU (Permit issued July 2022, 640 square feet, $180,000 valuation): Total permit fee $2,300
Note: no impact fees for ADUs under 750 square feet [3] - Brisbane’s ADU ordinance: no impact fees on ADUs under 750 sq ft; larger ADUs pay proportionally. [5]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [19]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [7]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [20][21]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [20]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [20]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Brisbane among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [22][23]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [17][24]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [25]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [25]
Not published or not verified
- Brisbane’s building fee schedule amounts and main-house design review rules were not checked.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- City of Brisbane: Building
- City of Brisbane: Building Permits
- San Mateo County ADU Resource Center (21 Elements): Brisbane local ADU rules (source page updated October 20, 2026)
- City of Brisbane: ADU/JADU FAQs
- City of Brisbane: ADU Compendium (PDF)
- City of Brisbane: Accessory Dwelling Units
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- City of Brisbane: Urban Lot Splits & Two-Unit Developments
- City of Brisbane: Urban Lot Split Application Checklist (PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- City of Brisbane: Handouts & Forms
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance