Building, remodeling or rebuilding a home in Atherton, CA
On this page: Contacts · ADUs & JADUs · SB 9 · Tear down & rebuild · Remodels & additions · Fees · Seismic · Electrification & PG&E · Cost context · Not published · Sources
Building and planning contacts
- Building Department: 80 Fair Oaks Lane, Atherton, CA 94027; phone (650) 752-0560; inspection requests (650) 752-0542. Plans are submitted through the Building Department ePlan Submittal Portal. [1][2][3]
ADU contact listed by the county ADU Resource Center: Brittany Bendix
Email: bbendix@ci.atherton.ca.us
Phone: 408.688.2432
Local ADU Website
ADU Ordinance [4]
ADU and JADU rules
This table is from the San Mateo County ADU Resource Center (run by 21 Elements, a partnership of the county’s cities and the County), page updated October 20, 2026 [4]. Confirm details with the city before you design.
| Size | Minimum: 150 square feet Maximum: Detached and Attached: 1200 square feet if setback requirements met Attached: no more than 1200 feet; less than 50% of primary dwelling, unless necessary to accommodate at least 800sf ADU JADU: 500 square feet Conversion of an existing accessory structure or portion of the existing primary residence not subject to unit size requirements. |
|---|---|
| Height | Attached: 25 feet or the allowed height of the zoning district, whichever is lower Detached: 16 feet 18 feet if within 1/2 mi walking distance of a major transit stop or high-quality transit corridor An additional 2 feet is allowed to accommodate a roof pitch that matches that of main home. 25 feet if located above garage (inclusive of garage) |
| Setbacks | JADUs: same setbacks as required for the main residence Attached ADU on a lot with an existing or proposed single-family dwelling unit: <800 sq ft ADUs: 4 feet side and rear setbacks; no front setback >800 sq ft ADUs: Can encroach 20% into the required side and rear setbacks. Detached ADU on a lot with an existing or proposed single-family dwelling unit: <800 sq ft ADUs: 4 foot side and rear setbacks >800 sq ft ADUs: Shall be located to maintain the setbacks for accessory buildings Detached ADU on a lot with an existing or proposed multifamily dwelling: 4 feet side and rear setbacks; no front setback |
| Parking | JADUs: No parking required ADUs: One spot may be required (tandem allowed). No parking required if: a. ADU is located within one-half mile of public transit. b. ADU is part of a proposed or existing primary residence or an existing accessory structure. c. On-street parking permits are required but not offered to the occupant of the ADU. d. A car share vehicle is located within one block of the ADU. e. The ADU is located within an architecturally and historically significant district. |
| Owner occupancy | 1. ADUs and JADUs Permitted Before January 1, 2020. The owner-occupancy requirements applicable to the ADU or JADU at the time of its permitting shall apply. 2. ADUs and JADUs permitted on or after January 1, 2020: No owner-occupancy requirements shall apply. |
| Process & timeline | Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. For construction of new units, Staff will review for compliance with physical standards within 60 days. Process can be found here: Plans & Specifications / Submittal Requirements (atherton.ca.us) In certain areas, must obtain a sewer permit from the West Bay Sanitary District before starting construction (www.westbaysanitary.org or call 650-321-0384). |
| Exceptions | ADUs 800-1200sqft exempt from FAR based on setbacks |
| Other local requirements | One JADU and two ADUs per parcel No short term rentals |
| Zones allowed | JADUs allowed in single-family residential zones; ADUs allowed in single-family and multi-family residential zones |
| Minimum lot size | None |
- ADU and JADU applications are approved ministerially, without a hearing. The Town must tell you within 15 business days whether the application is complete and approve or deny it within 60 days of a complete application when there is an existing home on the lot. [5]
- Atherton has a pre-approved ADU vendor plan path: submit a “Building Permit For Pre-Approved Vendor Application” with the pre-approved plans. Site-specific items (site plan, Construction Operations and Parking plan, tree protection plan, geotechnical report) are still required. [2]
- State baseline (all California cities): the city must approve or deny a complete ADU/JADU application within 60 days when there is an existing home; JADUs are limited to 500 sq ft inside the home; and ADUs of 750 sq ft or less pay no impact fees. [6][7]
SB 9: two units or a lot split
- Atherton adopted Municipal Code Chapter 17.53 (Ordinance 650, adopted March 16, 2022) to implement SB 9: up to two units on a single-family lot, or a split into two parcels with up to two units each. [8]
- Review is ministerial by the Planning Department. No building permits are issued for SB 9 units until the parcel map is recorded. [9]
- The tentative map checklist says completeness review takes up to 30 days, a Tentative Parcel Map Certificate is issued within 60 days of a complete application, the map is valid 24 months, and it lists a fee of $3,025.12 (FY 2022-23, so likely out of date). It also asks for photos and the build date of every structure so staff can assess historic value. [10]
- State rules (SB 9): ministerial approval of up to two units on a single-family lot, or a split into two lots of roughly equal size (neither under 40%, each generally at least 1,200 sq ft); the city must allow units of at least 800 sq ft; no demolition of rent-controlled, deed-restricted affordable or recently tenant-occupied housing; lot-split applicants sign a three-year owner-occupancy affidavit. [11]
Tearing down an old house and building a new one
City demolition permit and local restrictions
- A demolition permit is required for any complete demolition and may be required for partial demolition of more than 50% of the existing gross floor area. [1]
- Submit through the ePlan portal: building permit application, C&D recycling and waste calculation form, a Construction Operations and Parking (COP) plan with tree protection and a site plan of structures to be removed, plus fees and deposits. [1]
- By ordinance there is a minimum 10-working-day wait between submittal and permit issuance. During it you obtain the Air District “J number” and letters of service termination from PG&E (800-743-5000) and the sewer agency (West Bay Sanitary District (650) 321-0384 or Fair Oaks Sewer (650) 363-4100, depending on location). Gas must be terminated at the main/street. [1]
- Before issuance the Town Arborist visits the site, and a pre-demolition inspection checks construction fencing that screens the project from the street. Pools need a sewer-district drain permit or lab proof of dechlorination. [1]
Steps every teardown needs (regional and state rules)
- Air District “J number.” Every demolition of a load-bearing structure needs a Bay Area Air District demolition notification (J number), regardless of asbestos content, at least 10 working days before work starts; for buildings with four or fewer units, 72-hour notice is allowed for an extra fee. Cities require the J number before issuing a demolition permit. [12][13]
- Asbestos. For homes with four or fewer units, a full asbestos survey is not required, but specific materials (HVAC ducting, acoustic ceilings or plaster, textured walls, cement siding or stucco, resilient flooring) must be sampled and tested if they will be disturbed. [12]
- Lead paint. Renovation, repair and painting work that disturbs paint in homes built before 1978 is covered by EPA’s lead-safe RRP rule, which requires certified firms. [14]
- Gas and electric disconnect. Request the disconnect through PG&E Building and Renovation Services (Your Projects). PG&E removes the meter and cuts gas service at the main or property line. [15][16]
- Water and sewer. Water meter removal and sewer lateral capping are handled by your water provider and sewer agency; specific steps are listed above only where the city publishes them. Otherwise, the steps are not published on the city pages we checked.
Design review, floor area and height for the new house
- Atherton’s new-home design review steps, floor-area and height limits for the main house were not checked for this page. Ask the Planning Department and see the Atherton Municipal Code, Title 17. [17]
Published rebuild timelines and fees: beyond what is listed above, the city does not publish a total teardown-to-rebuild timeline or an all-in fee figure on the pages we checked. Not published.
Remodels and additions
- The Building Department issues permits for erection, alteration, demolition and moving of buildings, and enforces the California Building Code as adopted by the Town. [3]
- Plan check submittals need full plan sets (structural, MEP, Title 24 energy, CALGreen), a geotechnical report where applicable, a COP plan and a tree protection plan. Tree protection must be installed and inspected before permit issuance. [2]
- The California Residential Code that cities adopt (Section R105) requires a permit to build, enlarge, alter, repair, move or demolish a home or to change its electrical, gas, mechanical or plumbing systems. Section R105.2 exempts minor work such as painting, papering, tiling, carpeting, cabinets and countertops. Cities can amend these rules. Whether a job is issued over the counter or online or needs full plan check depends on the city, so ask the building division. [18]
Fees the city publishes
- Sample ADU permit fees reported for recent permits: Detached ADU, 1,199 square feet, $515,550 valuation: Planning: $1,380.41; Building Dept Permit fees: $5,601.62 [4]
- School impact fees are set by your school district, not the city. Residential additions of 500 sq ft or less are exempt under Education Code §17620; check your district for the current rate. [19]
- ADU impact fee waiver: no impact fees on ADUs of 750 sq ft or less or JADUs of 500 sq ft or less; larger ADUs pay in proportion to the main home’s size. [6]
Seismic retrofit programs
- Earthquake Brace + Bolt (EBB): grants of up to $3,000 toward a code-compliant retrofit for houses built before 1980 with a raised foundation or crawl space, in eligible ZIP codes, with a supplemental grant for households earning $94,480 or less. Registration opens in rounds, so check your ZIP. [20][21]
- Earthquake Soft-Story (ESS): grants of up to $13,000 for qualifying homes with living space over a garage or open ground floor. [20]
- No mandatory soft-story retrofit ordinance was found for this city on the pages checked. [20]
Electrification rules and PG&E service
- WestLight Energy (the county’s community energy provider) lists Atherton among San Mateo County jurisdictions with a reach code. Some reach codes require all-electric new construction, while newer ones use energy-performance targets instead. San Mateo County’s own 2025 reach code, for example, no longer mandates all-electric. Ask the building division which version applies to your permit date. [22][23]
- New or upgraded service: new electric and gas service, service upgrades (for example for an all-electric home or EV charging) and relocations are requested through PG&E Building and Renovation Services. Apply early, because utility work is often on the critical path. [16][24]
Typical cost context (published estimates only)
- The San Mateo County ADU Resource Center gives a very rough placeholder of $450–$600 per sq ft for ADU construction plus design and fees. Hard costs are typically about 85% of the budget, ranging from about $30,000 for a simple interior conversion to $400,000+ for a large hillside detached ADU. Kitchens run $25,000–$50,000 and bathrooms $15,000–$25,000 each. These are estimates, not quotes. [25]
- For new custom homes, full rebuilds and large additions, no city in this batch publishes a cost-per-square-foot figure, so we do not quote one. Get written bids based on your plans. [25]
Not published or not verified
- Atherton’s current building permit fee schedule and the main-house floor-area/height limits were not checked.
- The SB 9 tentative map fee shown is from FY 2022-23.
Planning a build, ADU, SB 9 split or remodel?
Tell us about your lot and your goals and request a free, no-obligation consultation. We can help you sort out which permits and rules apply before you hire a designer or builder.
Get a free build/remodel consultationSources
- Town of Atherton: Demolition Permit Checklist (rev. 3/30/23, PDF)
- Town of Atherton: ADU Process (incl. pre-approved ADU vendor plans)
- Town of Atherton: Building Department
- San Mateo County ADU Resource Center (21 Elements): Atherton local ADU rules (source page updated October 20, 2026)
- Atherton Municipal Code §17.52.050: ADU application review
- California HCD: ADU Handbook (March 2026, PDF)
- California HCD: Accessory Dwelling Units (state ADU program page)
- Town of Atherton: SB 9 Urban Lot Split
- Atherton Municipal Code §17.53.070: SB 9 application review
- Town of Atherton: Urban Lot Split (SB 9) Tentative Map Process checklist (PDF)
- California HCD: SB 9 Fact Sheet (PDF)
- Bay Area Air District: Asbestos Frequently Asked Questions (PDF)
- Bay Area Air District: Regulation 11, Rule 2 (asbestos demolition, renovation)
- U.S. EPA: Lead Renovation, Repair and Painting (RRP) Program
- PG&E: Gas Service Projects (gas disconnect guide, PDF)
- PG&E: Building and Renovation Services
- Atherton Municipal Code §17.52.040: ADU development standards
- 2025 California Residential Code, Chapter 1 (Section R105 Permits), via UpCodes
- California Education Code §17620 (school facility fees on residential construction)
- California Residential Mitigation Program: Check your eligibility (Earthquake Brace + Bolt, Earthquake Soft-Story)
- California Residential Mitigation Program: Program ZIP code search
- WestLight Energy (San Mateo County community energy provider): Reach Codes
- County of San Mateo: Summary of New Construction Reach Code (PDF)
- PG&E: Building and Renovation application resources
- San Mateo County ADU Resource Center: Budgeting & Finance